Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 19, 2022 at 8:00 PM
Updated January 8, 2026
Site work for a water / sewer project in Chuckey, Tennessee. Completed plans call for site work for a water / sewer project.
The Chuckey Utility District will receive separate sealed bids for the construction of A Water Line Replacement Project on Stone Dam Road Greene County ARP Funding The work to be bid on is as follows: Replacement of Existing Water Lines with 12 and 8 Ductile Iron Pipe. The allotted time for construction is 270 Calendar Days. Any bidder, upon returning the contract documents within 10 days after BID opening and in good condition, will be refunded his/her payment, and any non-bidder upon returning the Contract Documents will be refunded $ 0.00. This Project is being Funded by the Greene County ARP Funds. The Owner reserves the right to waiver any informalities or reject all bids. No bidder may withdraw his bid within 30 days after the actual date of the submittal thereof.
Award
Water / Sewer
$1,737,584.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
