BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work and paving for a civil project in Chuckey, Tennessee. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

All questions concerning the project must be received by 2:00 pm on Thursday, July 3rd, 2025 and all responses or addendums will be given to bidders by Monday, July 7th, 2025 at 2:00 pm. The portion of Bill Mauk Rod to be constructed is approximately 1,200 feet long with a 50 foot Right of Way. The new section of road is to be centered in the Right of Way with 20 feet of asphalt and at least 2 feet of shoulder on each side with a turn around located near Cassi Creek so, Sammy & Tammy Fellers (Tax Map 100E C Parcel 012.00) can access their property. The turn around must be built within 50 foot Right of Way. **The turn-around required on the Cassi Creek end of the project shall be Bull Head Type or similar. _ Damage #1525939, (Section 1)-Bill Mauk Road o Culvert Damage: Demolition and Removal _ Culvert, 1 each of Cast-in-place 3-cell Reinforced Concrete Box Culvert, 54.8 FT long x 28.9 FT wide x 10 FT high, Destroyed due to floodwaters, exacerbating erosion and road instability., 0% work completed. _ Guardrail: GPS Start (36.157117, -82.592244) End (36.156956, 82.592086), 2 each of Metal W-beam Guardrail, 75 FT long, High velocity flood water damaged roadway and washed away culvert and sections of the road. Culvert dimensions are in agreement with data from the National Bridge Inventory and Appraisal Report for Bridge ID 900B0920001. ***NOTE: The asphalt surface and guardrail portion of this bid may be delayed or eliminated at a later date pending Riverbank Stabilization by NRCS. It is included on the bid sheet as an alternate bid. 1. Grading, Drainage, Paving and Demolition/Removal of Box Culvert on Bill Mauk Road for Washington County Highway Dept. This Project is funded under an agreement with FEMA/TEMA The County reserves the right to accept or reject any or all bids and to waive informalities. It is the intent of this IFB to solicit bids for a qualified bidder to provide services for the grading, drainage, paving of approximately 1,200 feet on Bill Mauk Road that was damaged in the September 2024 storm. Demolition and removal of a box culvert will also be part of the bid. **A turn-around on the Cassi Creek end of the project will also need to be included in the bid (For example: Bull head type) Question Deadline 07/03/2025 at 2:00 PM ET Please contact Doug Jones at the Washington County Highway Department (423-753 1714) with any questions you may have concerning the IFB.

Award

Roads / Highways

$1,795,154.00

Public - County

Paving, Site Work

5

5

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

July 28, 2025

Project location map

Bill Mauk Rd, Chuckey, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.