BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a road / highway in Lake, Wisconsin. Working plans call for site work for a road / highway; and for paving for a road / highway.

All Bids Rejected. Town was unable to budget the projects for the 2023 season and will look to rebid the projects for the 2024 season. Reshaping of Kaiser Rd and Perch Lake Rd. Work to be provided will consist of crushing, hauling, shaping 4" of compacted 3/4 inch base aggregate dense gravel. approximately 7,050 cubic yards. Each road is approximately 2 miles in length or 3,520 cubic yards of gravel. Fees associated with stumpage shall be included in the total bid. The Town Board reserves the right to accept or reject any or all bids submitted.

Final Planning

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
15
Bidding Soon
223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

October 17, 2022

Project location map

Kaiser Rd and Perch Lake Rd, Lake, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.