Demolition, site work and new construction of a civil project in Haines City, Florida. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

The Work of this Project is generally described as demolition and construction services for Haines City Lift Station (LS) No. 4. The project includes: 1. Demolishing LS No. 4 to include removing all pumps, piping, valves, supports, electrical controls, all panels, conduit, wire, utility services, all relocated boxes, plumbing, electrical wiring, concrete and/or masonry structures, and appurtenances. 2. Replacing LS No. 4 with a new wet well, master manhole, concrete slab, access drive, fencing, transmission line tie-in, new submersible pumps, flow meter, piping, valving, controls, electrical appurtenances including power supply control panel, power meter, surge protection, main breaker panel, disconnects, transformers, switches, relays, floats, switches, and accessories meeting the City's design standards. 3. Installing a new doghouse master manhole and connecting it with the new wet well and existing gravity collection system. 4. Installing new radar level sensor, float switches, light pole with light, variable-speed drive (VFD) on the three pumps, meter disconnect, main breaker, automatic transfer switch (ATS) enclosure, demarcation panel, load center, test well, cabling, and associated accessories. 5. Purchasing and installing a design/build odor-control system for LS No. 4 to treat foul air from the lift station wet well and master manhole including all electrical, mechanical, structural, and instrumentation/controls. 6. Purchasing and installing a new generator. Questions due by Friday, Sep 23, 2022. All questions to be submitted to Vickie Ramsier by email to Vickie.ramsier@hainescity.com . Substantial Completion: 390-days Final Completion: 420-days Liquidated Damages: Milestones not achieved: $1,000.00 per day Substantial Completion: $500.00 per day Final Completion: $250.00 per day Performance and Payment Bonds - at least equal to contract amount. Project Involved Funding Agency (Contractor is required to follow funding agency project requirements): Florida Clean Water State Revolving Fund (SRF) SRF Disadvantaged Business Enterprise American Iron & Steel Davis-Bacon Wage Rates

Bid Results

Water / Sewer

$2,642,000.00

Public - City

Demolition, New Construction, Site Work

31

21

16

8

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
147
Bidding Soon
2,954
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2022

November 11, 2022

Project location map

704 Ave C, Haines City, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.