BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Pensacola, Florida. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000323922 The northernmost right of way and travel lane of Barrancas Avenue experienced issues with standing stormwater issues as well as water overtopping the curb. This is due to the existing stormwater conveyance system being undersized for its contributing basin's flow. This project will serve to increase the flow capacity of the conveyance system by installing additional inlets and upsizing the existing stormwater piping. As a bid alternate, the right of way will be fitted with bioretention cells to collect water from the travel lane. These bioretention cells no only provide relief for the overtaxed system but also provide stormwater treatment for a currently untreated drainage sub-basin within the Bayou Chico Watershed. As an additional bid alternate, this project is slated to incorporate new ECUA-owned sanitary sewer infrastructure at the Barrancas Ave and Main Street intersection. As a result of these improvements, work site safety, MOT, dewatering, maintenance/bypass of stormwater flow, and erosion control will be paramount issues. General work to be accomplished will include installation of new storm structures, new storm pipe, curb and gutter and sod. The LS Maintenance of Traffic item shall include all signs, devices and other cost associated with maintaining traffic during the project. While not anticipated or required, contractor may elect to perform portions of this project as night work. In the area of intersection with existing asphalt, pavement interface shall be saw cut and the perimeter milled to provide a clean seam between existing and proposed asphalt. Care shall be exercised to not cause any damage to adjacent infrastructure being left in-place during reconstruction. Any such damage shall be the responsibility of the contractor. All grade work and elevations shall reflect the design information provided in the construction plans. All proposed line and grade work shall be approved by the City Inspector. Contractor's work shall include the necessary coordination of all existing utilities with respective owners and to timely address any potential conflicts with required work. All sod placed shall be properly watered and maintained until permanently rooted/established to the satisfaction of the City. Maximum access shall be provided to the property and business owners at all times during construction. Due to the nature of the project, it is required that bidders visit the site and thoroughly review the plans and specifications. All work shall be in accordance with the standards and specifications of the City of Pensacola. Bonding Requirements - Bid Bond 5 % Question Deadline 07/17/2023 at 10:00 AM CT Questions are submitted online No Any questions concerning the solicitation should be addressed and submitted in writing no later than , to Dedria Lunderman, Assistant Purchasing Manager, City of Pensacola, 222 W. Main St., Pensacola, FL 32502 or at purchasing@cityofpensacola.com. Prospective bidders/respondents are hereby cautioned not to contact any member of the City of Pensacola staff or officials other than the specified contact person. Questions are submitted online No

Final Planning

Water / Sewer

$400,000.00

Public - City

Paving, Site Work

19

10

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
25
Bidding Soon
441
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2023

September 11, 2023

img_map_placeholder

Barrancas Ave, Pensacola, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.