Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 8, 2022 at 8:00 PM
Updated September 15, 2023
Site work and paving for a civil project in Tipton, Indiana. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Owner Office Greenfield District / Capital Program Mgmt Contract Type Project Specific Compensation Method Lump Sum Two Step Scoring No Allowable Profit Rate 8.5% Plus Overhead Factor Is Federal Funding Involved Yes # of Firms to Select 1 Project Development Services Two HMA Overlay, Preventive Maintenance Projects and 2 Bridge Deck Overlays all on SR-28 in Tipton County The selected firm shall perform preliminary engineering and plan development services necessary to produce construction contract documents in accordance with the INDOT project development process. The selected firm shall complete an Engineering Assessment (if necessary), Topographic Survey, Roadway Design and Plan Development, Hydraulic Analysis, Environmental Documentation, Permits Applications, Right-of-Way Plan Development (including R/W Engineering, Title Research and Staking, if needed), Geotechnical Engineering, Utility Coordination, Pavement Design, Construction Phase Services and other related services as needed. Other services such as Ecological Surveys, Archeological Investigations, Historical/Architectural Investigation, professional public outreach and marketing services, and Wetland Mitigation, may be included later if these work types become necessary. The selected firm's fee proposal shall be due 45 calendar days after the selection date for his RFP item. The contract may utilize the INDOT eInvoice application. 2100213 Des 2100213; SR 28, HMA Overlay, Preventive Maintenance, SR 213 to 5.10 mi E of SR 213 (WCL Elwood), in Tipton Co. RP 088+086 to RP 093+082 // Des 21002132; SR 28, HMA Overlay, Preventive Maintenance, 0.50 mi E of SR 19 E junction to SR 213 in Tipton Co. RP 085+039 to RP 088+086 // Des 2100739; SR 28 Bridge Deck Overlay, 0.88 mi E of SR 19 in Tipton Co. RP 085+064 // Des 2100740: SR 28 Bridge Deck Overlay, 2.45 mi W of SR 13 in Tipton Co. RP 092+040. $4,207,446.00 Teague, Sacha Prequalification Required: Yes The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Project Development Services - Two HMA Overlay, Preventive Maintenance Projects and 2 Bridge Deck Overlays all on SR-28
Conceptual
Roads / Highways
$4,207,446.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 11, 2023
IN-28, Tipton, IN
Related To This Project
Tipton, IN
Bid Date: Feb 20 2023
Tipton, IN
Bid Date: Mar 13 2023
Tipton, IN
Bid Date: Mar 13 2023
Tipton, IN
Bid Date: Mar 08 2023
Tipton, IN
Bid Date: May 08 2023
Tipton, IN
Bid Date: Sep 21 2021
Tipton, IN
Bid Date: Sep 21 2021
Tipton, IN
Bid Date: Sep 21 2021
Tipton, IN
Bid Date: Aug 23 2022
Tipton, IN
Bid Date: Aug 10 2022
Tipton, IN
Bid Date: Jun 09 2022
Tipton, IN
Bid Date: Feb 09 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed