BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Allons, Tennessee. Conceptual plans call for site work for a water / sewer project.

As of September 11, 2023, an engineer has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Overton County, Tennessee is requesting statements of qualifications from engineering firms on behalf of the North Overton Utility District to provide services for a water line extension project. Duties to be performed by the selected firm will include but are not limited to completing the infrastructure scorecard, preliminary engineering report, construction inspection, etc. Each submission will be evaluated according to the following criteria: o Specialized experience or technical expertise of the firm o Past performance record on contracts with the community as well as other clients o Capability of firm to perform the work within time limitations o Familiarity with the type of problems applicable to the project o Familiarity with local conditions The firm selected must comply with Executive Order 11246, Equal Employment Opportunity, the Civil Rights Act of 1964, Section 109 of the Housing and Community Development Act of 1974, and Section 3 of the Housing and Community Development Act of 1968. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$200,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
20
Bidding Soon
475
All Active Projects
219
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2023

img_map_placeholder

To Be Determined, Allons, TN


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.