BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a municipal facility in Avondale, Pennsylvania. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Bids must be submitted on forms furnished by the Township and accompanied by bid security in the amount of ten percent (10%) of the total bid. No bid may be withdrawn for a period of sixty (60) days after the scheduled time for the opening of bids. The successful bidder will be required to post a performance bond or other surety, to be in force for the length of the contract, in the amount of one hundred percent (100%) of the contract award. The Board of Supervisors of New Garden Township reserves the right to reject any and all bids, to waive any defects and/or irregularities in any bid and to make any award in any manner consistent with applicable laws, which is in the best interest of the Township. Requests for clarification are due Monday, November 7, 2022 4:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. The first phase involves removal of the "Caretaker Home" (Structure on #1 in Attachment #2) and associated utility lines with septic line cap, and backfill/compaction. This phase also involves removal of all remaining appurtenant material The second phase involves demolition of Structures identified on slides #2 - #12 in Attachment #2. Contractor shall demolish and remove all above and below ground debris and appurtenances including but not limited to; the main structure and/or any detached structures, all basements, footings, foundations, floors, porches, private sidewalks and debris of any kind. Contractor shall include the demolition and removal of all parking slabs, concrete and/or asphalt flatwork (not including park road areas), accessory/ detached structures, sheds or garages, trees, or any underground piping, junk, trash or dead trees which may be present. No debris shall be left or buried on the site. Demolition methods must include a means of controlling dust generated on the site. It is anticipated that the Board of Supervisors of New Garden Township will award the contract at its October 17, 2022, meeting, which will be held at 7:00 PM at the New Garden Township Building.

Award

Municipal

$79,879.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
311
Active Projects
142
Bidding Soon
2,671
All Active Projects
1,224
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2022

December 14, 2022

img_map_placeholder

6742 Limestone Rd, Avondale, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.