Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Waco, Texas. Conceptual plans call for site work for a bridge / tunnel.
Constructed in 1969 as twin continuous steel girder bridges, the Herring Avenue bridges spans 917 feet over the Brazos River. The Herring Bridge is an arterial road and an essential connection for vehicular traffic traveling between downtown Waco and East Waco. This bridge carries approximately 8,000 vehicles per day. In addition, this bridge is used recreationally by pedestrians to connect Cameron Park trails to the MLK walking paths. As part of the Bridge Program, City of Waco Public Works staff has begun to inspect The City's bridges, prioritize the needed improvements and develop plans for these improvements. The City of Waco bridge inspection of the Herring Bridge, supplemented by TxDOT bridge reports, identified structural concerns regarding the abutments, rocker assemblies and expansion joints. The rockers on the Herring bridge are moving separately and at different degrees with the largest rotation on the westbound bridge of approximately 17 degrees. Bridge rockers permit the natural expansion and contraction of a bridge due to thermal changes. Over rotation of the rocker bearings could cause the rockers to topple over, leading to a failure of the superstructure of the bridge. The debris currently built up around the rockers are increasing friction and trapping moisture which is contributing to faster degradation of the rockers. The 2020 TxDOT BRINSAP reports identify the southeast rockers and debris accumulation around the rockers as Urgent. An urgent classification requires action within 6 months. The proposed rehabilitation based on the Bridge Inspection Report and supported by City Staff will include replacement of the rocker bearing assemblies at each bridge abutment, replacement of expansion joints, deck resurfacing with a polymer overlay, bridge rail repairs, and bridge end protection systems. Preparation and implementation of a lifting plan will be required to support the bridge ends during the replacement of the bearings. The project is included in the city's 2023-2028 capital improvement plan (CIP). As of September 15, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$4,000,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2024
Herring Ave, Waco, TX
Related To This Project
Waco, TX
--
Waco, TX
Bid Date: Sep 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.