BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2025 at 7:00 PM

Updated November 6, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Fairfax, California. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Azalea Avenue Bridge is eligible for replacement under the Federal Highway Bridge Program (HBP) administered by CalTrans. The total project costs and funding includes construction, ROW, and design costs. Phase I design will include preliminary environmental assessments, community outreach, conceptual design, and cost estimates. Phase II is engineering design and ROW. Overall Ph 1&11 would be complete in 18-24 months. The project is 100% funded by State and Federal grants with the exception of CEQA costs. The County of Marin will cover up to $60,000 of the Town's CEQA and other out-of-pocket expenses. This project is in included in the City's or County's 2026-30 Adopted Budget (CIP). As of November 5, 2025, this project is in the design phase. A firm timeline for bidding and construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Bridges / Tunnels

$4,808,620.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
480
Active Projects
205
Bidding Soon
2,861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

Azalea Ave, Fairfax, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.