BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Rangely, Colorado. Conceptual plans call for the renovation of a 22,140-square-foot educational facility.

The Colorado Northwestern Community College is seeking qualified firms for design services for two projects located on the Rangely Colorado campus. The first project requires the selected firm to design an upgraded electrical distribution system in the Johnson Building (22,140 SF). The existing main electrical services, and the majority of the electrical distribution equipment is original to the 1960 construction and consists of 800A, 277/480V Square D Main Switchboard with fusible switches. The main electrical services then feeds to the building mechanical and plumbing equipment with a sub-distribution board, 277/480V, 3 phase panel board that distributes power to receptacles, HVAC, and cafeteria equipment. Additionally, the selected firm will be required to spec and design the integration of a backup power generator to serve as emergency power for the Johnson Building and the McLaughlin server room. The selected firm will be required to evaluate the needs, best methods, and code requirements to perform the electrical upgrades. The successful design team will be required to design the electrical distribution system to a Fixed Limit Cost of Construction of $1.2 million. The second project requires the selected firm to assess existing exterior lighting providing a design to phase out all metal halide and mercury vapor bulbs. CNCC intent is to utilize existing light poles with upgraded lighting technology, to add additional poles for outdoor lighting. The successful design team will be required to design the LED lighting upgrades to a Fixed Limit Cost of Construction of $80,000 CNCC anticipates using Design/Bid/Build for both projects. Oral Interviews. It is anticipated that oral interviews will be conducted during the week of October 10th, 2022. Interview location and time will be communicated with the short-listed firms. Key personnel from the firm and major consultants who will be directly involved with the project should attend the interview. The interview panel will, in particular, be interested in knowing about the project approach proposed and in meeting the individuals who will act as the primary contacts with the [agency/institution]. Date Email Questions Due September 23, 2022 Date Email Answers Issued September 26, 2022 The method of contractor selection has not been determined at this time.

Conceptual

Educational

$1,280,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
13
Bidding Soon
164
All Active Projects
73
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 3, 2023

August 3, 2023

img_map_placeholder

500 Kennedy Dr, Rangely, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.