EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 24, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Winnipeg, Manitoba. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

PTH 101 Segment 1 - PTH 1 (Portage Ave) to PR 221 Location 1 - West Service Road (3.30km North of PTH 1) Work involves building embankment, crushed rock, granular base course and drainage improvements 600m south of Boychuk road to Provincial Trunk Highway 190 for a total construction distance of approximately 800m in the Municipality of Rosser. Location 2 - PTH 101 (2.7km North of PTH 190) The work involves removing direct access from Road 63N onto Provincial Trunk Highway 101 (i.e., east and west accesses) c/w median opening removal including removing pavement, earth excavation, removing metal culverts and removing and installing concrete curbing in the Municipality of Rosser. Location 3 - PR 221 (PTH 101 Interchange) The work involves extension of the existing westbound bypass lane, including crushed rock, granular base course and bituminous pavement c/w regrading of the west service road connection at Provincial Road 221 in the Municipality of Rosser. Segment 2 - PTH 101 (PR 221 to PTH 7) Location 4 - PTH 101 North Service Road (PR 236 to Lilyfield) The work involves reconstruction and construction of an embankment, including horizontal road realignment, widening/benching, surface preparation, granular base course, bituminous pavement, drainage improvements c/w installation of metal pipes, in the Municipality of Rosser. Location 5 - PTH 101 (2.6km East of PTH 6) The work involves removing the direct access (north) from Sturgeon Road onto Provincial Trunk Highway 101, including removing metal culverts, removing pavement, acceleration and deceleration lanes and landscaping in the Municipality of Rosser. Segment 3 - PTH 101 (Highway 7 to Pipeline Rd.) Location 6 -Holmes Road (King Edward St. Intersection) The work involves realignment of the King Edward intersection, removing existing metal pipes, installation of metal pipes, excavation, bench cut, ditching and gravelling in the Municipality of Rosser. Location 7- Holmes Road (King Edward St. to Ritchie Street) The work involves raising the vertical alignment (i.e.., centreline road profile), removing and installing metal pipes, excavation, bench cutting, ditching and gravelling for a total construction distance of approximately 1.4 km in the Municipality of Rosser. Segment 4 - PTH 101 (Pipeline to Highway 8) Location 8- Holmes Road (Pipeline to Second Street) The work involves surface preparation type, base and bituminous pavement including, granular base course, from Pipeline Road to Second Street, for a total construction distance of approximately 2.9km, in the Municipality of West St. Paul. Location 9- Kapelus Road Repair various locations The work involves construction of embankment, including roadway excavation, granular base course and bituminous pavement, for a total construction distance of approximately 0.2km, in the Municipality of West St. Paul. Location 10 - PTH 101 (PTH 15 and Franklin Ave Access/Apron) The work involves surface preparation, granular base course and bituminous pavement at PTH 15 and Franklin Ave Access/Apron, in the Municipality of Springfield. Question Acceptance Deadline 2022/09/20 12:00:00 AM CDT Questions are submitted online No Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Roads / Highways

$9,487,777.00

Public - State/Provincial

Paving, Site Work

10

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
24
Bidding Soon
306
All Active Projects
146
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

North Perimeter Safety Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.