EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 4, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Hatboro, Pennsylvania. Completed plans call for the renovation of a educational facility.

Project Number- 2251A Upper Moreland School District Middle School TLC Room Alterations Sealed Proposals will be received by the Upper Moreland School District ( Owner ) for General Construction and Electrical Construction for the Upper Moreland Middle School TLC Room - Alteration Project. Bidders must register with the Architect prior to receiving Bidding Documents. . Questions regarding the bid shall be emailed using RFI format (Request For Information) to eric@gkoarchitects.com. Proposals shall conform to all requirements as set forth in the bidding documents. The right to waive any informality in any bid, to reject any or all bids, or to award any Contract in the best interest of the Owner is reserved. General Construction: i. Work includes all labor, materials, equipment and services necessary for the Architectural (A-Series), Specification Divisions 01 through 14 and other activities traditionally recognized as general construction. ii. Work includes Project Coordination and related administration responsibilities including but limited to: 1. Creation, publication and updates of a project schedule. iii. Work includes the following Temporary Facilities: 1. Temporary plastic and tape to prevent construction dust from travelling to areas outside of the Work Area. 2. Temporary partitions separating area of work- maintain occupied building egress paths. 3. Final Cleaning of Work Area prior to Substantial Completion. b. Mechanical Construction i. Work includes all labor, materials, equipment and services shown on the Mechanical / HVAC (M-Series) drawings, Specification Divisions 01, 23 and as traditionally recognized as mechanical construction. ii. Work includes coordination of MEP systems and ceiling coordination drawings. iii. Work includes the following Temporary Facilities: 1. None c. Plumbing Construction i. Work includes all labor, materials, equipment and services shown on the Plumbing (P-Series), and Fire Protection (FP-Series) drawings, Specification Divisions 01, 21, 22 and as traditionally recognized as plumbing and fire protection construction. ii. Work includes coordination of MEP systems and ceiling coordination drawings. iii. Work includes the following Temporary Facilities: 1. None d. Electrical Construction i. Work includes all labor, materials, equipment and services shown on the Electrical (E-Series), drawings, Specification Divisions 01, and 26 through 28 and traditionally recognized as electrical construction. ii. Work includes coordination of MEP systems and ceiling coordination drawings. iii. Work includes the following Temporary Facilities: 1. Temporary Lighting Bid results GENERAL CONSTRUCTION - S & S Electrical Services, Inc. - $ 87,900.00 ELECTRICAL CONSTRUCTION - Electric-Tech, Inc. - $ 33,600.00

Award

Educational

$121,500.00

Public - City

Renovation

17

20

4

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Execution and Closeout Requirements, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Casework
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
253
Bidding Soon
4,575
All Active Projects
2,151
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

December 12, 2022

img_map_placeholder

4000 Orangemens, Hatboro, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Upper Moreland School District - Middle School TLC Room Alterations - GC/EC Only

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.