BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Hatboro, Pennsylvania. Completed plans call for the renovation of a educational facility.

Project Number- 2251A Upper Moreland School District Middle School TLC Room Alterations Sealed Proposals will be received by the Upper Moreland School District ( Owner ) for General Construction and Electrical Construction for the Upper Moreland Middle School TLC Room - Alteration Project. Bidders must register with the Architect prior to receiving Bidding Documents. . Questions regarding the bid shall be emailed using RFI format (Request For Information) to eric@gkoarchitects.com. Proposals shall conform to all requirements as set forth in the bidding documents. The right to waive any informality in any bid, to reject any or all bids, or to award any Contract in the best interest of the Owner is reserved. General Construction: i. Work includes all labor, materials, equipment and services necessary for the Architectural (A-Series), Specification Divisions 01 through 14 and other activities traditionally recognized as general construction. ii. Work includes Project Coordination and related administration responsibilities including but limited to: 1. Creation, publication and updates of a project schedule. iii. Work includes the following Temporary Facilities: 1. Temporary plastic and tape to prevent construction dust from travelling to areas outside of the Work Area. 2. Temporary partitions separating area of work- maintain occupied building egress paths. 3. Final Cleaning of Work Area prior to Substantial Completion. b. Mechanical Construction i. Work includes all labor, materials, equipment and services shown on the Mechanical / HVAC (M-Series) drawings, Specification Divisions 01, 23 and as traditionally recognized as mechanical construction. ii. Work includes coordination of MEP systems and ceiling coordination drawings. iii. Work includes the following Temporary Facilities: 1. None c. Plumbing Construction i. Work includes all labor, materials, equipment and services shown on the Plumbing (P-Series), and Fire Protection (FP-Series) drawings, Specification Divisions 01, 21, 22 and as traditionally recognized as plumbing and fire protection construction. ii. Work includes coordination of MEP systems and ceiling coordination drawings. iii. Work includes the following Temporary Facilities: 1. None d. Electrical Construction i. Work includes all labor, materials, equipment and services shown on the Electrical (E-Series), drawings, Specification Divisions 01, and 26 through 28 and traditionally recognized as electrical construction. ii. Work includes coordination of MEP systems and ceiling coordination drawings. iii. Work includes the following Temporary Facilities: 1. Temporary Lighting Bid results GENERAL CONSTRUCTION - S & S Electrical Services, Inc. - $ 87,900.00 ELECTRICAL CONSTRUCTION - Electric-Tech, Inc. - $ 33,600.00

Award

Educational

$121,500.00

Public - City

Renovation

17

20

4

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
443
Active Projects
195
Bidding Soon
4,035
All Active Projects
1,872
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

December 12, 2022

img_map_placeholder

4000 Orangemens, Hatboro, PA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.