Published December 2, 2022 at 7:00 PM

Updated October 1, 2024

Site work, paving and new construction of a mixed-use development in Fort Covington, New York. Completed plans call for site work for a road / highway; for paving for a road / highway; for the construction of a pre-engineered storage facility; pre-engineered storage facility; water / sewer project; and pre-engineered storage facility.

The summary of the overall Project consists of providing all labor, materials and resources necessary to install all Work for Phase I of the Transfer Station Upgrades which will include site access road expansion, construction of storm water pond and miscellaneous storm water improvements, supply and install pre-engineered metal building on concrete foundation and removal and disposal of Transtor Hoppers and concrete foundation for the SRMT Transfer Station located at 179 County Route 43, Fort Covington, New York, as further described in the Bid Documents. SRMT is utilizing "online" construction project management software for viewing and downloading copies of the Bid Documents. All electronic correspondence is tracked and archived by Procore and bidders are provided with the most up-to- date information for the project. Interested bidders must contact the SRMT's Grants and Contracts Office to be added to the bidders list for this project and to obtain access to bid documents, drawings and technical specifications. Questions and requests should be directed to: Grants & Contracts Office, Saint Regis Mohawk Tribe, 71 Margaret Terrance Memorial Way, Akwesasne, NY at (518) 358-2272 and by e-mailing: grants.contracts@srmt-nsn.gov no later than five (5) days prior to bid opening. Representatives of the Owner will be present to discuss the Project. Owner will issue an Addendum containing the minutes as they consider necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. The Owner will not reimburse any bidder for expenses to attend this meeting. Due to the current ongoing COVID-19 Emergency and SRMT Social Distancing regulations, companies are asked to send no more than two (2) representatives on the company's behalf. All site visits should be in strict accordance with current SRMT regulations regarding COVID-19 safety. Masks are OPTIONAL and social distancing will continue to be followed. Davis Bacon Prevailing Wage Rates, Bid and Contract Security are mandatory requirements of this call. The following preferences apply to this solicitation: Native Preference, Women Business Enterprises. In accordance with the Saint Regis Mohawk Tribe's Native American Preference Policy, the Saint Regis Mohawk Tribe will give preference in the award of a Contract to approved Native American Owned Business/Company, as certified by the Saint Regis Mohawk Tribe's Compliance Department. Any bidder claiming Native American Preference must give evidence to support this claim with their submitted bid. The successful Bidder, as well as their Sub-Contractors, will be required to complete a Native American Preference Employment Plan and Agreement.

Under Construction

Warehouse / Distribution - Pre-Engineered Storage Building

$1,346,000.00

Public - Federal

New Construction, Paving, Site Work

59

45

8

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
194
Bidding Soon
2,320
All Active Projects
1,114
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

November 21, 2022

img_map_placeholder

179 Co Rte 43, Fort Covington, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Transfer Station Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.