BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Jefferson City, Missouri. Conceptual plans call for the renovation of a educational facility.

Lincoln University of Missouri will be accepting Qualification Statements for professional design services to renovate an existing campus facility to include areas for specialized training. The spaces include EOTC (Emergency Operations Training Center), indoor firing range, office, and instructional spaces with advanced technology. The expectations will include refurbishing the exterior envelope of the facility to include window replacement, roof repairs, tuckpointing, waterproofing, and ADA access. The interior renovation will include new mechanical systems, interior upgrades, life safety and code compliance, new finishes, and modernizations throughout the building. The construction budget is approximately $1 million dollars. Each qualification statement should include the following information for consideration. o A list and brief description of similar projects designed during the past five years, particularly on higher education facilities. o A client list and point of contact for previous projects. o A list of proposed design team members and their experience on similar projects. o The past record of performance of your firm with respect to such factors as control of costs, quality of work, and ability to meet schedules. o The capacity and capability of the firm to perform the work in question, including specialized services, within the time limitations fixed for completion of the project. o A proposed list of all subconsultants. Lincoln University is a diverse community and recognizes the importance of supplier diversity and welcomes the development and utilization of certified Minority, Women, Veteran and Service-Disabled Veteran-owned Business Enterprise (MBE/WBE/VBE/SDVBE). Lincoln University encourages the participation of MBE/WBE/VBE/SDVBEs in its vendor process both at the prime vendor level as well as at the subcontractor level. Please respect the University's position regarding participation of MBE and WBE companies. This will be considered a priority during the evaluation of qualification statements. For design contracts overall participation goals shall be 10% MBE and 5% WBE, with desired participation goals of 20% MBE and 10% WBE. Please keep this in mind as you structure partnerships with key team members. The university's selection committee will review all qualification statements and select three firms to visit campus for final selection interviews. The selection committee will recommend a design firm to the Board of Curators. Once approval has been received by the Board, work will begin immediately after a signed contract is completed. Any questions or comments, please contact us at lufacilitiesplanning@lincolnu.edu. The method of Contractor Selection has not been Determined at this time

Conceptual

Educational

$1,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
60
Bidding Soon
660
All Active Projects
294
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 5, 2023

img_map_placeholder

820 Chestnut St, Jefferson City, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.