Site work and paving for a civil project in Springfield, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of October 13, 2022, project was awarded but awarded amount is not available. Materials: All major materials to be supplied by City Utilities as indicated in project specifications Insurance: Required within 3 days of Notice of Award. Performance and Payment Bond: Required within 3 days only if your bid exceeds $50,000. All work under this contract shall be Substantially Complete prior to the Ultimate Completion Dates listed below. The Contractor may start work at any date their schedule allows so long as all work is substantially completed by Ultimate Completion Date. Substantial Completion includes the following: Successful pressure testing of all pipe (main and service) All pavement repairs complete Landscape restoration complete up to and including initial seeding All permanent fence work complete All piping connections to existing facilities (including house connections) complete, purged, and operable All work underthis Contract shall have an Ultimate Completion Date of November 14, 2022. In the event the contractor does not complete the work on or before the date(s) listed, City Utilities shall be entitled to damages as provided herein. It is agreed that actual damages are difficult, if not impossible, to ascertain, and therefore, the sum agreed upon is not a penalty, but rather a liquidated amount to eliminate the problem of proof. The parties agree that City Utilities will sustain some actual damage on account of delay notwithstanding the difficulty or impossibility of proving the amount and further agree that the liquidated sum agreed upon bears a reasonable relation thereto and to the size of the contract itself. The parties further agree that this is a Public Works contract and that owner will be entitled to recover the liquidated amount upon proof of contractor's failure to complete the work within the time limited in the contract without any evidence as to the fact or amount of actual monetary damage. The liquidated damages for not completing a Project within the identified Completion Calendar Day Limit will be $500 per calendar day. The liquidated damages for not substantially completing ALL WORK under this Contract by the identified Ultimate Completion Date shall be $500 per calendar day.

Award

Water / Sewer

$400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
18
Bidding Soon
347
All Active Projects
135
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2022

October 24, 2022

img_map_placeholder

Multiple Locations, Springfield, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.