BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2022 at 8:00 PM

Updated November 14, 2023

Site work for a water / sewer project in Stafford Springs, Connecticut. Completed plans call for site work for a water / sewer project.

Deadline for Written Questions: September 23, 2022 The Contractor will furnish all labor, equipment, and materials to perform the requested dredging/mucking of the pond. The excavation shall include the development of access for equipment from the west side of the pond, dredge/muck pond an additional three (3) feet (+/-) feet of depth with sloped sides, that meet the contour of the surrounding land, clear vegetation from the banks of pond, and install rip rap on the banks of the pond, repair any damage to lawn to include re-seeding caused by the excavation activities. The Contractor shall be responsible for determining the best methods and equipment to use with a goal of maximizing the area of dredging. The Contractor shall be responsible for the stockpiling of the material removed from the pond at a designated area on site. WSFD may entertain alternatives for the dredged materials if the Contractor can provide a market for said spoils. Further, the project scope may be amended to account for the potential increased trucking/transportation costs related to the proposed alternatives for said spoils. It is WSFD's preference that questions be delivered via email with the subject line titled WSFD Pond Dredging Bid and addressed to: Bigcheese42@yahoo.com Alternatively, questions may be submitted in writing by U.S. Mail and addressed to: West Stafford Fire Department WSFD Pond Dredging Bid 144 West Stafford Road Stafford Springs, CT 06076 Responses should include: -Name of Company -Address of Company -Principal contact person & title -Phone number -Email address -Cost to remove vegetation from banks of pond -Cost to dredge/muck 3 feet (+/-) of silt from pond bottom -Cost to install rip rap rock on bank of pond -Cost to make repairs to lawn -Total cost of project -Estimated availability to start project -Estimated completion time -Bid needs to be signed & dated WSFD reserves the right to reject any and all proposals.

Post-Bid

Water / Sewer

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
683
Active Projects
270
Bidding Soon
5,054
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

October 28, 2022

Project location map

144 W Stafford Rd, Stafford Springs, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.