Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 1, 2022 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in 100 Mile House, British Columbia. Completed plans call for site work for a bridge / tunnel.

The proposed contract is for the installation of one (1) concrete slab bridge, and accompanying water management plan. Bridge 64-177, to be installed at 10.500 km on Lang Lake FSR Branch 4 aka 610Rd (MH5956.04), will be a 13.600m CONCRETE SLAB BRIDGE ON STEEL TOWERS AND PRECAST CONCRETE SPREAD FOOTINGS (see attached structure design and drawing). Documents can be obtained from www.bcbid.gov.bc.ca.

Award

Bridges / Tunnels

$138,350.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
2
Bidding Soon
51
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2022

November 3, 2022

Project location map

Multiple Locations, 100 Mile House, BC


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed