BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Hastings, Minnesota. Completed plans call for site work for a playground / park / athletic field.

The Department of Natural Resources is seeking bids for for prescribed rotational goat grazing on 43.5 acres at Afton State Park in Washington County. The goal of the project is to reduce the density of woody shrubs in bluff prairie and oak woodland communities. General Project Description: This bid solicitation is for prescribed rotational goat grazing on 43.5 acres at Afton State Park in Washington County. The goal of the project is to reduce the density of woody shrubs in bluff prairie and oak woodland communities. The primary vegetation targeted for removal includes buckthorn, prickly ash, honeysuckle and sumac. The 2 project locations are near the Visitor Center (T27, R20, S2) and park office (T27, R20, S10). See attached project maps for approximate size and location of paddocks. The project involves grazing one paddock near the Visitor Center and one paddock near the park office. The total project area is 43.5 acres split between the two different paddocks. 1. The Visitor Center area (17.5 acres) is completely surrounded by park maintenance roads and trails. Parts of this area have been hand cut or brush mowed over the last four years. Brush size ranges from first year re-sprouts to 10+ foot tall buckthorn. The Visitor Center area is mixed between flat on top and sloped (average 21% slope) with a north/northwest aspect. Access to this project area will be via park maintenance road. 2. The Office area (26 acres) is surrounded by park roads, trails, and restored prairie. Previous cutting in this area was done more than five years ago. Brush size ranges from seedling to 10+ foot tall buckthorn. The office area is a mixture of flat and sloped (average 32% slope) with a south/southeast aspect. Access to the top of this area is near the park shop. Access to the bottom of this area will be from the main park road. The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary prescribed rotational goat grazing on 43.5 acres at Afton State Park in Washington County. The goal of the project is to reduce the density of woody shrubs in bluff prairie and oak woodland communities. The primary vegetation targeted for removal includes buckthorn, prickly ash, honeysuckle and sumac. The contract that results from this Request for Bids prohibits any construction trade work as defined by the Department of Labor, Prevailing Wage Division and Minn. Stat. 177.41 through 177.44. Bid Bond: 5% ASSURANCE OF COMPLETION (PAYMENT AND PERFORMANCE BOND) Not applicable SCHEDULE / TIME OF COMPLETION Work cannot commence before receipt of Notice to Proceed. Final Completion of the work shall be on or before June 30, 2023.

Award

Playgrounds / Parks / Athletic Fields

$19,520.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
67
Bidding Soon
1,763
All Active Projects
605
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 22, 2022

October 21, 2022

June 30, 2023

img_map_placeholder

6959 Peller Ave S, Hastings, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.