BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Iron Mountain, Michigan. Working plans call for the renovation of a medical facility.

PRESOLICITATION NOTICE ANTICIPATED IFB FOR THE BELOW REFERERENCED PROJECT AT IRON MOUNTAIN VAMC Upgrade Primary Care Floor 1 Project # 585-20-112 Date: 8/22/2022 Statement of Work I. Overview: The Upgrade Primary Care Floor 1 project includes renovation of the phlebotomy lab, volunteer and coffee area, as well as updating finishes in the existing Outpatient Primary Care Clinic. II. Scope of Work: Contractor shall furnish all labor, materials, equipment and supervision in accordance with the documents, drawings and specifications to complete the Upgrade Primary Care Floor 1; 585-20-112, at the Oscar G. Johnson VA Medical Center, Iron Mountain, MI. Work includes HVAC, plumbing, electrical, data, finishes, and other aspects of construction as required by the drawings and specifications. Period of Performance: Phase 0 Administrative shall be completed within 60 days of NTP Phase 1 Construction shall be completed within 210 days from NTP Attachments: DRAWINGS AND SPECS TO BE INCLUDED IN SOLICITATION. The method of contractor selection has not been determined at this time.

Final Planning

Medical

$250,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
21
Bidding Soon
358
All Active Projects
101
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 1, 2022

June 29, 2023

img_map_placeholder

325 E H St, Iron Mountain, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.