Site work and renovation of a civil project in Hazleton, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

2022 Operational Upgrades - Part B - WTP Chemical (Lime) Upgrades Project Bids will be accepted for pressure regulating valve upgrades, leak detection equipment, fixed base meter read equipment and a domestic water booster pump. A certified check or bid bond drawn to the order of the Hazleton City Authority - Water Department in an amount equal to ten percent (10%) of the bid must be submitted with each proposal as bid security and received at the Authority's Office with all other required bid documents prior to the Bid Opening. Bidders shall comply with all procedures and requirements of the Contract Documents. The HCA encourage DBEs, including MBEs and WBEs, to submit a bid proposal. All Prime and sub-contractors shall make the required good faith efforts when subcontracting and shall provide all documents to substantiate their search prior to award. Prior to the award of any Contract, the successful bidder shall furnish to the Owner Certificates of Insurance, Performance Bond, Labor and Material Payment Bond, American Steel certifications, DBE/WBE Compliance Documents, and any other items as required by the Contract Documents. A satisfactory surety shall execute all bonds. Bidders on all work will be required to comply with the Pennsylvania Human Relations Act No. 222. The Commonwealth of Pennsylvania, Department of Labor and Industry and Federal Prevailing Minimum Davis Bacon Wage Determinations, which are included as, part of the Contract Documents. All required wage rates for this project and shall govern all work under this Contract. The Hazleton City Authority - Water Department is an Equal Employment Opportunity Employer. Except as otherwise provided by law, no Bidder may withdraw a bid within sixty (60) consecutive calendar days after the actual date of the bid opening or one hundred twenty (120) consecutive calendar days if the award is delayed by a required approval of another governmental agency, the sale of bonds, or the award of a grant or grants. The Hazleton City Authority - Water Department hereby reserves the right in its discretion, which is understood and agreed to by all bidders, to reject any and all bids submitted, and also reserves the right to waive any irregularities, omissions, mistakes, or informality in the Bidding Process. The Bid, if awarded, will be awarded at the sole discretion of the Authority at the lowest total cost to the best responsive and responsible Bidder based on a final review work to be awarded as selected by the Owner. All bidders must show adequate knowledge, experience and past projects in similar size and complexity. Clarification Deadline: 10/26/2022 2:00 PM Construction Contracts: The Owner shall seek to receive bids for the following multiple prime contracts. Coordination with and between all Prime Contracts shall be included in all bidders scope of work as required to meet completion date. Work shall include all demolition, installation and start-up for a complete new system including Owner provided equipment and equipment purchased by Owner directly thru PaCostars. Contractor shall provide all labor, materials and all other items as required. In addition the proposals must cover all labor, equipment, materials, layout, disposal and all other incidental costs required to complete all work including but not limited to scope as defined in its entirety by the Contract Documents and bid forms including but not limited to the following: 1. Operational Upgrades Part B - WTP Chemical Upgrades Project: Replace and install chemical feed system upgrades for the Lime Feed System used for Hazleton City Authority's water treatment plant. The project will include removal of the existing system, complete lime room cleaning, and ultimately installation of the new system and modifications. The new infrastructure includes a Chlorine Dioxide System and Lime Chemical Feed System, both to be purchased and provided by HCA. Miscellaneous plant upgrades are also included in the project and consist of servicing a static mixer, filter console repairs and upgrades, installation and purchase of a Zeta Potential analyzer (online and lab), and additional pipe modifications. The project also includes the purchase and install of a complete catwalk system for the caustic talk. The project is located in Luzerne County, Pennsylvania and being completed for Hazleton City Authority (HCA) Water Department.

Bid Results

Water / Sewer

$638,180.00

Public - City

Renovation, Site Work

13

20

8

8

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
98
Bidding Soon
1,532
All Active Projects
714
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

December 1, 2022

img_map_placeholder

400 E Arthur Gardner Pkwy, Hazleton, PA


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.