BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 19, 2023 at 7:00 PM

Updated September 15, 2023

Site work and renovation of a water / sewer project in Dayton, Wyoming. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Project has been awarded but award amount was not confirmed. Dayton Waste Water Treatment Plant Improvements - Phase II 1. Removal of the current UV disinfection system and installation of a disinfection system consisting of a chlorine (Cl2) gas feed system followed by de-chlorination through use of sodium dioxide (SO2). 2. Installation of a subsurface aeration system in Cells #1 and #2. 3. Construction of a new blower/disinfection building to house: a. new blowers for the proposed aeration system improvements; b. the Cl2 and SO2 gas cylinders and feed equipment; and c. related electrical and instrumentation equipment. 4. Construction of a contact chamber to provide adequate time for Cl2 to contact the treated effluent, to be followed by injection of SO2 for de-chlorination purposes prior to discharge into the Tongue River. 5. installation of new electrical power cables and related equipment to accommodate the proposed improvements. 6. Removal and replacement of the existing barbed wire fence which is located along the property lines of the site. Est. Completion Date: Oct. 1, 2023

Award

Water / Sewer

$3,000,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
10
Bidding Soon
163
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2022

January 4, 2023

Project location map

To Be Determined, Dayton, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.