Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 7, 2023 at 7:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Weston, Massachusetts. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Construction began on April 22, 2023. Description: Bridge Bundle, Replacement and Rehabilitation at I-90/I-95 Interchange Design-Build Project Location: Newton - Weston Project Type: Bridge - Construction MASSDOT - RFP D/B - Bridge Bundle, Replacement and Rehabilitation at I-90/I-95 Interchange

Under Construction

Bridges / Tunnels

$288,102,180.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
858
Active Projects
421
Bidding Soon
5,696
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

April 22, 2023

Project location map

Multiple Locations, Weston, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed