BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work and paving for a mixed-use development in Apache Junction, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

0000 PN APJ APJ-0-(217)T City of Apache Junction (Old West Hwy Idaho Rd to Goldf) The proposed work is located in the city of Apache Junction. The length of the project is 2.97 miles in total which includes work along Old West Highway, from Idaho Road on the west end to Goldfield Road on the east end of the project, and Winchester Road, from Broadway Avenue on the south end to Old West Highway on the north end. The work consists of constructing a new sidewalk along the south side of Old West Highway and on the west side of Winchester Road including sections that are attached with concrete curb and gutter and sections that are detached. The work includes several box culvert extensions, bridge railing, scuppers, pedestrian access ramps, guardrail modifications, seeding, signing and pavement markings, and other related work. Central District Item # 100840 Engineering Specialist: Yusuf Kadem Question Deadline 09/02/2025 The Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to The Bid Opening Date May Not Be Answered. The time allowed for the completion of the work included in this contract will be 320 working days. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 10.01 . The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. AZDOT - Pedestrian Facilities Improvements - Old West Highway and Winchester Rd

Bid Results

Sidewalks / Parking Lot

$2,818,888.00

Public - State/Provincial

Paving, Site Work

107

5

6

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
41
Bidding Soon
1,201
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2025

November 4, 2025

Project location map

E Old West Hwy & S Winchester Rd, Apache Junction, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.