BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Pine Top, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.

22AML010 (Vernon Mullins) site is located at 205 Buffalo Road, Pine Top in Knott County, KY, 41843. GPS coordinates at the site are 37 16' 46.895"N, 82 51' 12.87"W. On or about August 1, 2022, a heavy storm event damaged work previously performed by the Division of Abandoned Mine Lands, specifically overwhelming the existing drainage structures causing erosion and sedimentation of areas in near proximity to the site. Damage included sedimentation upstream, downstream and within the 60" HDPE pipe and drainage channel and erosion exposing/destabilizing the pipe and headwalls as well as damaging the pipe/headwall interface on the upstream side. Outlet sections of installed HDPE pipes were dislocated from their original place and washed downstream. Aggregate within the stream channel was dislocated and road culvert pipes were damaged. Pavement on Buffalo Road was damaged and destabilized. To address this concern, the stream channel above and below the 60" HDPE pipe will be re-shaped to promote drainage and large aggregate in the channel will be placed to armor side slopes. Sediment in the Mullins yard and adjacent maintained areas will be removed and/or graded to the approximate original configuration. The eroded area near the outlet of the 60" HDPE pipe will be filled with suitable onsite material and No. 2 Stone aggregate, and pipes previously running through this area as part of the AML project will be replaced or repaired. An allowance for removal/ replacement and repair of existing utilities within the work area has been included. Materials deemed unfit for use at the project site will be transported to an approved waste area for disposal. This project will not address underground mine openings. No trees will be disturbed as part of this repair project. All areas disturbed by this project will be revegetated by means of standard AML revegetation practices. Sediment control will be provided by installation of silt checks or silt traps downstream/downslope of the work area and silt fence. Service Start : 10/17/2022 Service End : 11/16/2022

Award

Roads / Highways

$49,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
79
Bidding Soon
724
All Active Projects
350
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 13, 2022

October 17, 2022

November 16, 2022

img_map_placeholder

205 Buffalo Rd, Pine Top, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.