BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 20, 2023 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a mixed-use development in Boylston, Massachusetts. Conceptual plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

As of July 20, 2023, the project is currently in feasibility study. A design firm has not been selected as of yet. A timeline to select a design firm has not been disclosed. *The closed solicitation has been included below for reference: The Town of Boylston (Town) is seeking the services of a qualified Designer within the meaning of and in accordance with M.G.L. Chapter 7C, Section 44, to provide professional design and construction administration services for a proposed new Senior Center and Public Safety (Police and Fire) building or buildings to be located in Boylston, Massachusetts (the Project).

Conceptual

Fire / Police

$75,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
661
Active Projects
245
Bidding Soon
4,782
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.