BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 5, 2023 at 7:00 PM

Updated April 10, 2025

Site work for a water / sewer project in Cape May, New Jersey. Completed plans call for site work for a water / sewer project.

Work at the Cape May Ferry Terminal generally consists of, but is not limited to, the installation of new steel fender panels with keeper chain supports and the replacement of rubber fender elements in Slips 1 and 2. Work at the Lewes Terminal generally consists of, but is not limited to, the removal of the existing fenders, installation of new rubber elements, and remounting the existing fenders.Supplier Diversity Fund Contribution Source 5.00 % Board Approval Required Yes Bid Bond/Guarantee Required Yes 10.00 % Project Satisfies Federal & Acquisition Rules Yes

Award

Water / Sewer

$833,650.00

Public - City

Site Work

8

13

12

13

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
6
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2022

January 9, 2023

Project location map

Multiple Locations, Cape May, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.