Published November 4, 2022 at 8:00 PM
Updated September 15, 2023
Site work and paving for a mixed-use development in White Center, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
This project has been awarded to CA Carey Corp. A/E ESTIMATE: $1,650,000 to $1,850,000. This project is located at the intersection of SW Roxbury St & Olson Place SW & 4th Ave SW. The signal rebuild includes roadway work and removal and replacement of concrete panels. Project also includes installation of curb bulbs, ADA compliant curb ramps, sidewalk, paint striping and drainage improvements. For the purpose of the Bidder/Subcontractor List this project includes rebar installation and electrical work. This Contract will be administered by the Director of the Seattle Department of Transportation, subject to the approval and acceptance of the Director of Finance and Administrative Services. All questions must be e-mailed and be directed to the following Kari Frizzell Seattle Department of Transportation kari.frizzell@seattle.gov Purchasing and Contracting FAS_PW_Admin@seattle.gov 206-684-0444 Mark Sliger Seattle Department of Transportation Construction Management Mark.Sliger@Seattle.Gov 206-733-9936 For purposes of the Inclusion Plan, this is considered a Roadway type of project with a Past Performance of 19 Percent WMBE utilization rates based on completed projects All questions on the Inclusion Plan must be directed to Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Backup contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188. Work must begin immediately on the Notice To Proceed Date in the Written Notice from the Engineer and after the date of such notice must be physically completed within the following period per Section 3 of the Agreement: 80 WORKING DAYS If the successful Contractor fails to complete Work within the time set forth above, (s)he will be charged Liquidated Damages per Section 4 of the Agreement and Section 1-08.9. See Section 1-08.9 for method for determining cost of liquidated damages. Refer to Section 1-02.4(2) for information about any geotechnical or environmental reports, soil boring data, soil sample test data, or other data accumulated by the Engineer. Signal rebuild includes roadway work and removal and replacement of concrete panels. Project also includes installation of curb bulbs, ADA compliant curb ramps, sidewalk, paint striping and drainage improvements. For the purpose of the Bidder/Subcontractor List this project includes rebar installation and electrical work.
Award
Roads / Highways
$2,261,749.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.