Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 17, 2022 at 7:00 PM
Updated October 1, 2024
Site work and paving for a road / highway in Gonzales, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
For Ps&e Package Questions Call: Clayton Harris 403 Huck Street Yoakum, Tx 77995 979/533-0478 Length: 0.01 Mi Time for Completion: 75 Working Days For Questions Regarding a Proposal Call 512/416-2498 County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Gonzales 0025-05-024 Sh 80 Ua 90 F 2023(225) 0.25 Mi E of Cr 143 Length: 6.21 Miles Gonzales 0025-06-057 0.25 Mi E of Cr 143 Ua 90 F 2023(225) Gonzales C-l Length: 7.4870 Miles Colorado 0026-04-049 Fayette C/l Us 90 F 2023(225) Cr 210 Length: 6.4920 Miles Colorado 0026-06-037 Fm 2434 Us 90 F 2023(225) Fm 806 Length: 1.6870 Miles Colorado 0027-01-048 0.75 Mi East of Bs 71f Us 90 F 2023(225) Ih 10 Length: 2.0050 Miles Victoria 0088-06-006 Guadalupe River Bu 59-t F 2023(246) N of Us 59 Length: 4.8610 Miles Austin 0187-03-074 Fm 1094 Sh 36 F 2023(246) 1500' South of Sl 350 Length: 0.7650 Miles Fayette 0211-09-035 Us 77 Fm 155 F 2023(225) Colorado C/l Length: 14.3450 Miles Matagorda 0241-04-024 Fm 521 Sh 60 F 2023(225) 1.207 Mi S of Fm 521 Length: 1.0030 Miles Matagorda 0241-05-013 1.207 Mi S of Fm 521 Sh 60 F 2023(225) Fm 2031 Length: 7.8220 Miles Wharton 0266-05-053 Fm 961 Sh 71 F 2023(246) Fm 1300 Length: 5.3680 Miles Wharton 0266-06-049 Bu 59s Sh 71 F 2023(246) Matagorda C/l Length: 10.1070 Miles Fayette 0268-01-058 1.50 Mi South of Fm 155 Us 77 F 2023(246) 0.60 Mi South of Fm 2436 Length: 3.31 Miles Fayette 0268-02-037 0.60 Mi South of Fm 2436 Us 77 F 2023(246) Schulenburg C-l Length: 9.0220 Miles Lavaca 0269-03-039 Us 90a Ua 77 F 2023(225) Mustang Creek Length: 4.3740 Miles Lavaca 0269-04-040 Mustang Creek Ua 77 F 2023(225) Sh 95 Length: 6.2050 Miles Austin 0271-18-004 0.125 Mi South of Ih 10 Fm 3538 F 2023(248) Fm 3013 Length: 3.2060 Miles Gonzales 0287-03-037 Us 90a Sh 80 F 2023(225) .155 Mi S of Cr 104 Length: 7.0810 Miles Gonzales 0287-04-039 0.155 Mi S of Cr 104 Sh 80 F 2023(225) 2.1 Mi N of Sh 97 Length: 4.51 Miles Lavaca 0346-06-054 De Witt C/l Sh 111 F 2023(248) Jackson C/l Length: 21.5340 Miles De Witt 0346-11-009 S Kennedy St Sh 111 F 2023(248) Lavaca C/l Length: 0.1940 Miles Victoria 0371-01-092 Bu 59t Bu 77-s F 2023(225) Us 59 N Front Rd Length: 3.41 Miles Fayette 0416-01-002 Us 77 Ss 92 F 2023(225) End of Maintenance Length: 0.31 Miles Jackson 0497-02-044 Fm 234 Fm 616 F 2023(225) Fm 1593 Length: 4.0690 Miles Jackson 0497-03-011 West Carancahua Creek Fm 616 F 2023(225) Matagorda C/l Length: 6.0190 Miles Gonzales 0584-01-002 Us 183 Pr 11 F 2023(225) Fm 1586 Length: 1.9640 Miles Wharton 0709-02-057 Colorado C/l Fm 102 F 2023(225) Fm 960 Length: 12.8520 Miles De Witt 0941-03-111 Us 183 Fm 237 F 2023(225) Victoria C/l Length: 4.8890 Miles Jackson 1090-01-028 Cr 274 Fm 530 F 2023(225) Us 59 Length: 8.4180 Miles Fayette 1262-01-017 Sh 95 Fm 1115 F 2023(225) Gonzales C/l Length: 6.6760 Miles Fayette 1264-01-016 Sh 159 Fm 955 F 2023(225) Sh 71 Length: 4.6580 Miles Matagorda 1321-01-023 Sh 35 Fm 1095 F 2023(225) Fm 521 Length: 8.2410 Miles Wharton 1412-03-042 475 Ft N of N Alabama Rd Fm 1301 F 2023(248) Fm 442 Length: 9.8210 Miles Victoria 1698-01-024 Fm 236 Fm 1685 F 2023(247) Bu 59t Length: 6.4180 Miles Austin 1721-02-013 586' West of Schluens Rd Fm 1094 F 2023(225) 1091' West of Fm 2187 Length: 5.2620 Miles Jackson 1945-01-023 Sl 521 Fm 1822 F 2023(248) Fm 3131 Length: 7.5770 Miles Calhoun 2016-01-013 Sh 35 Fm 2143 F 2023(225) Sh 172 Length: 4.5510 Miles Colorado 2349-01-009 Us 90a Fm 2437 F 2023(225) Lavaca C/l Length: 2.99 Miles Victoria 2601-01-016 Us 87 Fm 2615 F 2023(225) Fm 1686 Length: 5.7360 Miles Matagorda 2697-01-036 Fm 3057 Fm 2668 F 2023(225) Fm 521 Length: 5.1080 Miles Matagorda 3087-01-009 End of Maintenance Fm 3057 F 2023(225) Fm 2668 Length: 2.3860 Miles Calhoun 3171-01-011 Fm 1090 Fm 3084 F 2023(248) Independence Drive Length: 3.7760 Miles Colorado 3205-03-014 Us 90a Fm 3013 F 2023(225) Wharton C/l Length: 5.6060 Miles Wharton 3205-04-007 Colorado C/l Fm 3013 F 2023(225) Fm 102 Length: 0.7080 Miles Fayette 0334-07-007 Lee C/l Fm 448 C 334-7-7 Fm 153 Length: 3.4130 Miles Calhoun 0420-08-009 Sh 172 Ss 159 C 420-8-9 End of State Maintenance Length: 2.2960 Miles Jackson 0515-01-072 Cr 112 (Lost Bridge Rd) Fm 234 C 515-1-72 Us 59 N Frt Rd (El Toro) Length: 3.2670 Miles Jackson 0671-01-004 Sh 35 Fm 3280 C 671-1-4 Calhoun C/l Length: 2.9990 Miles Calhoun 0671-02-004 Jackson C/l Fm 3280 C 671-2-4 End of State Maintenance Length: 1.9970 Miles Gonzales 0687-01-015 Us 87 Fm 77 C 687-1-15 Fm 108 Length: 8.4180 Miles Matagorda 0847-04-008 Fm 2668 Fm 2078 C 847-4-8 Sh 60 Length: 2.3570 Miles Wharton 1302-02-014 Sl 523 Fm 647 C 1302-2-14 End of Maintenance Length: 4.4920 Miles Fayette 2348-01-007 Fm 609 Fm 2436 C 2348-1-7 Us 77 Length: 1.9420 Miles Fayette 2382-01-005 Fm 1291 Fm 2503 C 2382-1-5 Sh 71 Length: 6.1210 Miles Calhoun 2714-01-005 End of State Maintenance Fm 2717 C 2714-1-5 Sh 316 Length: 3.4660 Miles Austin 2894-01-014 Fm 949 Fm 2187 C 2894-1-14 Sh 36 Length: 11.8760 Miles De Witt 3012-01-008 End of State Maintenance Fm 2980 C 3012-1-8 Sh 72 Length: 3.1790 Miles De Witt 3012-02-006 Sh 72 Fm 2980 C 3012-2-6 End of State Maintenance Length: 2.5650 Miles Wharton 3014-02-005 End of Maintenance Fm 647 C 3014-2-5 Sl 523 Length: 2.4360 Miles
Award
Roads / Highways
$18,739,125.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 3, 2022
January 2, 2023
UA 90, Gonzales, TX
Related To This Project
Gonzales, TX
Bid Date: May 04 2022
Gonzales, TX
--
Gonzales, TX
Bid Date: Aug 27 2020
Gonzales, TX
Bid Date: Apr 05 2022
Gonzales, TX
Bid Date: Apr 26 2022
Gonzales, TX
Bid Date: Mar 18 2022
Gonzales, TX
Bid Date: May 04 2022
Gonzales, TX
Bid Date: Aug 18 2022
Dallas, TX
--
Pasadena, TX
Bid Date: Nov 03 2022
San Antonio, TX
Bid Date: Nov 15 2022
Dallas, TX
--
Dallas, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
![](https://projects.constructconnect.com/hubfs/science-bokeh2%20(1).webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.