Renovation of a mixed-use development in Clifton Springs, New York. Completed plans call for the renovation of a educational facility.

Proposals for Midlakes Capital Improvement Projects 2020 - Phase 3 (Volume 1 & 2) High School & Middle School Reconstruction (43-13-01-06-0-011-018) -The project consists of renovations and site improvements to Phelps-Clifton Springs Central School District MS/HS. Contract #305: Plumbing Work Covid-19 Construction: To the extent required by SED guidance and other applicable law, construction shall continue as long as each contractor complies with social distancing requirements, cleaning and disinfecting protocols, testing and/or proof of vaccination requirements, and all applicable law and protocols in connection with COVID-19 exposure control at the jobsite. Any Bidder upon returning such set in good condition within seven (7) days after the date set for Bid opening will be refunded the deposit. Midlakes CSD reserves the right to waive any informalities and reject any or all Bids or to accept the one that in its judgment will be for the best interest of the Owner, all in accordance with applicable law. Midlakes CSD further reserves its right to disqualify Bidders for any material failure to comply with the "Instructions to Bidders". A Bid Bond or Certified Check made payable to the Owner in the amount of five percent (5%) of the Bid, subject to the conditions provided in the Instructions to Bidders, must be deposited by each Bidder with his Bid as a guarantee that in the case the contract is awarded to him, he will within ten (10) days thereafter, execute such contract and furnish a satisfactory Performance and Payment Bond, and that Bidder shall not withdraw his Bid for a period of forty-five (45) days after the above date of Bid opening, and to guarantee the performance of all other obligations of the Bidders as set forth in Instructions to Bidders. NYS DOL Prevailing Wage applies to this project. The work is tax exempt. Work shall be commenced and continuously and diligently prosecuted immediately after contracts have been signed subject to and in accordance with the contract requirements. Contact: Construction Manager o Jon Bates, Project Manager o Watchdog Building Partners o Ph: (585) 409-4708 Architect o Joe Twomey, Sr. Project Manager o Edge Architecture, PLLC. o Ph: (585) 771-0447 The Midlakes CSD adheres to a policy of nondiscrimination since race, creed, color, disability, gender, national origin and other protected categories in employment, programs, and services. Project no- 18320

Post-Bid

Educational

$100,000.00

Public - City

Renovation

127

30

47

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Bonds, Warranties, Spare Parts, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Air Barriers, Roofing and Siding Panels, Flashing and Sheet Metal, Flexible Flashing, Self-Adhering Sheet Flashing, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Flush Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Special Function Doors, Sound Control Door Assemblies, Entrances and Storefronts, Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Special Wall Surfacing, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting, Exterior Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Storage Assemblies, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Theater and Stage Equipment, Acoustical Shells, Folding and Portable Stages, Collection and Disposal Equipment, Solid Waste Handling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Window Shades, Roller Window Shades, Casework, Furnishings and Accessories, Table Accessories, Glassware, Portable Lamps, Lamps, Furnishing Accessories, Clocks, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Pneumatic Control System for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Indoor Central-Station Air-Handling Units, Modular Indoor Central-Station Air-Handling Units, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Manufacturing Equipment, Assembly and Testing Equipment, Cutting Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
109
Bidding Soon
1,124
All Active Projects
485
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

December 19, 2022

img_map_placeholder

1490 NY-488, Clifton Springs, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Midlakes CSD Capital Improvement Projects 2020 - Phase 3 (Volume 1 and 2) - Contract #305: Plumbing Work

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.