Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Milford, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Work to Be Done: Division No.1 Work generally consists of 26 S.Y. of Subbase, Modified, 6"; 7 EA of Manhole Adjustment, Minor; 26 S.Y. of Pavement Removal; 1 L.S. of Temporary Traffic Control; 1 L.S. of Mobilization; 26 S.Y. of Manhole Boxouts. Division No. 2 Work generally consists of 127 S.Y. of Subbase, Modified, 2"; 76 L.F. of Storm Sewer, Trenched, 2000D RCP, 12"; 80 L.F. of Removal of Storm Sewer, HDPE/PVC, <36" DIA.; 1 EA of Manhole, Circular Storm Sewer, SW-401, 48 IN; 60 L.F. of Curb and Gutter, 2.5'x2"; 11 S.Y. of Removal of Sidewalk; 60 L.F. of Removal of Curb; 11 S.Y. of Sidewalk, PCC, 5"; 103 S.Y. of Driveway, Granular; 100 S.Y. of Full Depth Patch, HMA; 100 S.Y. of Pavement Removal; 1 L.S. of Temporary Traffic Control; 1 L.S. of Mobilization; 2 EA of Special Pipe Connection. Division No.3 Work generally consists of 19 S.Y. of Subbase, Modified, 2"; 1 EA of Intake Adjustment, Minor; 19 L.F. of Curb and Gutter, 2.5'x6"; 19 L.F. of Removal of Curb; 13 S.Y. of Full Depth Patch; 18 S.Y. of Pavement Removal; 1 L.S. of Temporary Traffic Control; 1 L.S. of Mobilization. Division No. 4 Work generally consist of 10 C.Y. of Topsoil, On-Site; 120 S.Y. of Subbase, Modified 2"; 190 S.Y. of Subbase, Modified, 6"; 6 L.F. of Storm Sewer, Trenched, 2000D RCP, 15"; 4 L.F. of Removal of Storm Sewer, RCP, < 36"; 90 S.Y. of Removal of Sidewalk; 25 S.Y. of Removal of Driveways, PCC; 66 S.Y. of Sidewalk, PCC, 5"; 29 S.Y. of Sidewalk, PCC, 6"; 190 S.Y. of Full Depth Patches; 190 S.Y. of Pavement Removal; 0.4 STA of Painted Pavement Markings, Solvent/Waterborne; 1 L.S. of Temporary Traffic Control; 1 L.S. of Convectional Seeding, Seeding, Fertilizing, and Mulching; 25 L.F. of Filter Sock; 25 L.F. of Filter Sock, Removal; 1 L.S. of Mobilization; 1 L.S. of Repair, Storm Sewer Pipe; 4 EA of Patch Subdrain.
Post-Bid
Water / Sewer
$126,037.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2022
November 21, 2022
Multiple Locations, Milford, IA
Related To This Project
Milford, IA
Bid Date: Jul 23 2021
Milford, IA
Bid Date: Oct 05 2023
Milford, IA
Bid Date: Dec 08 2022
Milford, IA
Bid Date: Apr 07 2022
Milford, IA
Bid Date: Dec 22 2021
Milford, IA
Bid Date: Feb 17 2022
Milford, IA
Bid Date: Mar 30 2022
Milford, IA
Bid Date: Mar 30 2022
Milford, IA
Bid Date: Nov 10 2022
Altoona, IA
Bid Date: Oct 21 2022
Iowa City, IA
Bid Date: Nov 01 2022
Rock Rapids, IA
Bid Date: Aug 11 2022
Pocahontas, IA
Bid Date: Nov 10 2022
Ankeny, IA
Bid Date: Sep 27 2022
Marengo, IA
Bid Date: Oct 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.