Published January 10, 2023 at 7:00 PM

Updated May 15, 2026

Site work and paving for a road / highway in Astor, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

SR 40 from Marion County Line to Volusia County Line As of January 10, 2023, this project has been awarded. Counties: Lake Road Name: SR 40 Limits: 11140000 Project(s): 44529415201(*) Federal Aid No: N/A Total Roadway Length: 8.958 Miles Contract Days: 300 Total Bridge Length: 0.000 Miles Total Proposal Length: 8.958 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 LEAD The Improvements under this Contract consist of milling and resurfacing the pavement on SR 40 from MP 0.094 to MP 7.698 in Lake County. Within these limits the project includes superelevation correction of the horizontal curves, widening right turn lanes to accommodate bicycle keyholes, paving or repaving turnouts at select locations, replacing damaged sidedrains, updating signing and TMS sites to current standards, including the appropriate type of audible vibratory pavement markings and updating guardrail treatments. The project also includes the installation of underdrain on both sides of the SR 40 project corridor from MP 4.600 approximately 1.67-miles to MP 6.264. FDOT - Call Order: 015 - Milling & Resurfacing

Award

Roads / Highways

$8,096,921.00

Public - State/Provincial

Paving, Site Work

38

5

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
320
Active Projects
116
Bidding Soon
2,107
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

January 2, 2023

Project location map

FL-40, Astor, FL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed