EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 17, 2022 at 7:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in North Las Vegas, Nevada. Completed plans call for the renovation of a medical facility.

A. Project No.: 593-22-102 NAICS Code: 236220, Commercial and institutional Building Construction, $39.5M IAW FAR 36.204- Disclosure of the magnitude of construction projects: Between $100,000 and $250,000. B. This is FFP construction. Offerors shall furnish all labor, material, transportation, required engineering services, overhead, and profit to provide walls and upgrade to access doors in Medical Center Building 1 and Administration Building 6. This will be a "Turn Key" installation and service that the contractor shall provide all necessary equipment, door accessories, equipment compatible with integration to existing Lenel Physical Access Control System (PACS), wall assembly, automatic door openers, supplies needed that will meet ADA and VA requirements IAW SOW. C. Place of Performance is at VA Medical Center North Las Vegas. (Please see section 1 of SOW.) D. The Government intends to award a task order without conducting discussions with offerors; however, the Government reserves the right to conduct discussion if later determined to be in the best interest of the Government. The basis of an award is a trade-off between non-price factors and price utilitzing the comparative analysis approach. OFFERORS MUST BE VERIFIED IN VIP AT THE TIME SUBMISSION OF OFFER AND PRIOR TO AWARD (Please see page 6 of this document for details.) E. Project completion date: 180 calendar days after notice to proceed. F. A pre-solicitation conference and site visit have been scheduled on Wednesday, 12 October 2022, 09:30 AM PDT. at VA Medical Center North Las Vegas. G. Questions and/or request for information (RFI) must be submitted using the RFI form, attached and are due 10/19/2022 by 2:00 PM PDT, to the Contract Specialist, Christopher Whipple, by email at christopher.whipple@va.gov H. An offer guarantee is required in the form of a bid bond, which may be submitted electronically by the proposal due date/time to the Contract Specialist, Christopher Whipple by email at christopher.whipple@va.gov. Note: Performance and bonds will be required by the successful offeror within ten (10) days of notice of award. All provisions, clauses, and other terms and conditions are IAW the respective VISN 21 MACC contract. I. All MACC (Group 1) holders are afforded the opportunity to submit an offer for this TORFP. All interested MACC Group 1) holders shall submit a proposal for this task order that responds to the instructions as stated in this TORFP. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 593-22-3-5905-0031

Post-Bid

Medical

$250,000.00

Public - Federal

Renovation

22

14

4

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Demonstration and Training, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Sheet Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Derricks, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
16
Bidding Soon
338
All Active Projects
130
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

December 16, 2022

img_map_placeholder

6900 N Pecos Rd, North Las Vegas, NV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.