Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 19, 2022 at 8:00 PM
Updated January 26, 2024
Renovation of a mixed-use development in Rochester, Minnesota. Completed plans call for the renovation of a laboratory facility.
Directions to Heintz Center (1926 College View Road East, Rochester, MN 55904): HWY 52 Southbound: Exit at 41st STREET exit to access 37th STREET NW (turns into East Circle Drive and County Road 22) and travel east through the intersection of US 63. Before the County Road 9 intersection (stop light), merge right onto County Road 9 (College View Road). Take a left at the 4-way stop sign and another left into the parking lot of Heintz Center. HWY 63 Southbound: Exit (left) at 37th STREET NW (turns into East Circle Drive and County Road 22). Follow directions in italics above. HWY 63 Northbound: Exit at HWY 14 East (also known as 12th Street) and travel east. Turn left at 15th Avenue SE/Marion Road intersection. Follow 15th Avenue to 4th Street and turn right onto 4th street. At 4-way stop, turn right and then left into parking lot of Heintz Center. I-90: Exit at HWY 63 North and follow instructions above. HWY 14 Westbound or Eastbound: Exit at County Road 22 (30th Avenue) and follow to County Road 9 intersection. Turn left onto County Road 9 (College View Road). Take a left at the 4-way stop sign and another left into the parking lot of Heintz Center. To access the electronic bid form, download the project documents and click the online bidding button at the top of bid advertisement (on-line bid button will be available when the project is published and ready for bid submitting). Parties that download the Drawings and specifications and need to have them printed elsewhere, are solely responsible for those printing costs. The Project consists of the installation of an industrial dust collector and HEPA filtration system for welding fume extraction and ancillary ductwork, piping, fume hoods, electrical work, and controls, along with an exterior equipment pad to serve the welding shop at the CTECH facility on the Rochester Community and Technical College campus. Additionally, the work will include but is not limited to, all related specialties, and finishes. The Project consists of the installation of an industrial dust collector and filtration system for welding fume extraction and ancillary ductwork, piping, fume hoods, electrical work, and controls to serve the welding shop at the CTECH facility on the Rochester Community and Technical College campus. Additionally, the work will include but is not limited to, all related specialties, and finishes Description of the Project: 1. Install filtration unit, blower, Delta-P Plus controller, and silencer, provided by Owner, to serve CTECH welding shop. 2. Provide and install associated ductwork, slot hoods, piping, spark arrestor, electrical, controls, and all related specialties and finishes related to the welding shop upgrades. Question Deadline 10/13/2022
Bid Results
Laboratories
$229,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
