Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Hana, Hawaii. Completed plans call for site work for a water / sewer project.
The work includes the furnishing of labor, materials, supplies and equipment required for the construction of the Helene Hall Septic System Improvements, which consists of the following major elements: The work includes the furnishing of labor, materials, supplies and equipment required for the construction of the Helene Hall Septic System Improvements, which consists of the following major elements: Conversion of existing Aeration Treatment Units (ATUs) into septage holding tank and pump station. Construction of a 1 %" force main x 1,350 ft long starting at Helene Halil, along Keawa Place and Uakea Road, ending at the field adjacent to the Hana Ball Park. Installation of new Off Site Treatment Unit 14 ft x 8 ft. Construction of absorption field 36.5 ft x 32.6 ft. Sewer manhole, cleanout and other appurtenances. Electrical work and control panels Conversion of existing Aeration Treatment Units (ATUs) into septage holding tank and pump station. Construction of a 1 %" force main x 1,350 ft long starting at Helene Halil, along Keawa Place and Uakea Road, ending at the field adjacent to the Hana Ball Park. Installation of new Off Site Treatment Unit 14 ft x 8 ft Construction of absorption field 36.5 ft x 32.6 ft. Sewer manhole, cleanout and other appurtenances. Last Day to Submit Questions October 27th Submit via Public Purchase Only Last Addenda November 3rd Bid Opening November 10th Contract Award November 15th Contract Request November 25th Electrical work and control panels Bidders must be qualified in compliance with section 103D-310 of the Hawaii Revised Statutes No facility tour will be given. Prospective bidders are strongly encouraged to visit the site on their own and address all questions to the County Work under this contract includes furnishing all labor, materials, equipment, and services required for concrete rehabilitation at various wastewater reclamation facilities, consisting of the following major elements: A. Demolish ATU and cesspool distribution boxes and remove and modify piping as shown on the Drawings. B. Rehabilitate two (2) existing ATU's at Helene Hall as a process tank and settling/storage tanks. C. Install one (1) new OTU feed pump station. Including new control panel, float switches, submersible vertical turbine pump, and associated electrical and piping work. D. Construct 1-1/2-inch diameter PVC pressurized sewer force main, approximately 1,300 linear feet long, located between Helene Hall and Hana Ball Park parking lot. E. Two (2) concrete sewer manholes. F. Two (2) concrete vaults with combination air relief valve assemblies. G. One (1) concrete distribution structure. H. Install one (1) OTU with associated control panel, pumps, piping, valves, instrumentation, and appurtenances. I. Construct new absorption bed, approximately 900 Square Feet in Size, including ten (10) rows of infiltration chambers and infiltration chamber inspection ports.
Award
Water / Sewer
$1,739,929.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 16, 2022
January 16, 2023
174 Keawa Pl, Hana, HI
Related To This Project
Hana, HI
Bid Date: Sep 29 2022
Hana, HI
Bid Date: Jul 23 2021
Hana, HI
Bid Date: Mar 22 2022
Hana, HI
Bid Date: May 23 2022
Hana, HI
Bid Date: Aug 19 2022
Hana, HI
Bid Date: Apr 06 2023
Haiku, HI
Bid Date: Nov 02 2022
Makawao, HI
Bid Date: Nov 03 2022
Kahului, HI
Bid Date: Nov 17 2022
Wailuku, HI
Bid Date: Nov 14 2022
Wailuku, HI
Bid Date: Nov 04 2022
Honolulu, HI
Bid Date: Nov 18 2022
Kahului, HI
Bid Date: Nov 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.