Published December 16, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Indiana, Pennsylvania. Completed plans call for the renovation of a educational facility.

Bids will be received for the following contract(s): General Construction Plumbing Construction Mechanical Construction Electrical Construction CLARIFICATION DEADLINE 11/8/2022 4:00 PM All questions about the meaning or intent of the Contract Documents shall be submitted via electronically. No questions will be accepted by phone, fax, or direct e-mail. Each bidder must deposit, with the bid, Security in the amount of 10 percent of the bid and subject to the conditions provided in the Instructions to Bidders. The work in connection with this project constitutes a Public Works by a Public Body under Pennsylvania Prevailing Wage Act. Bidders are advised that prevailing minimum wage rates, promulgated by the Pennsylvania Secretary of Labor, which must be paid to workmen employed on this project, are incorporated in the Contract Documents. All bids shall remain irrevocable for sixty days after the actual date of the opening thereof unless award is delayed due to the required approval of another government agency, the sale of bonds, or the award of a grant or grants; in which case, bids shall be irrevocable for one hundred twenty days in compliance with Act 317 of 1978 approved November 26, 1978, as amended. Bid Results: General Contractor: JC Orr & Sons, Inc. $273,903 Plumbing Contractor: First American Industries, Inc. $ 25,700 Mechanical Contractor: First American Industries, Inc. $877,000 Electrical Contractor: Westmoreland Electric Services $243,000

Award

Educational

$1,419,603.00

Public - City

Renovation

47

23

13

10

Subscribe For Documents

85 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Fabricator Qualifications, Installer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Bonds, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Shop-Fabricated Structural Wood, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Interior Specialties, Partitions, Storage Specialties, Storage Assemblies, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Controls
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Roof Drains, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Central Cooling Equipment, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Ventilators, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Screening Devices, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Material Storage, Storage Equipment and Systems, Storage Cabinets
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
105
Bidding Soon
850
All Active Projects
407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2022

January 16, 2023

img_map_placeholder

501 E Pike Rd, Indiana, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

East Pike Elementary - Admin Renovations - General Construction, Plumbing Construction, Mechanical Construction and Electrical Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.