BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Frankfort, Kentucky. Completed plans call for the renovation of a municipal facility.

Vendors' Written Questions Due: 10/18/22 by 10:00 a.m. EST. Commonwealth's Response to Written Questions: 10/25/22. Scope of Contract The Finance and Administration Cabinet, Division of Engineering and Contract Administration on behalf of the Department for Facilities and Support Services (DFSS), Division of Building Services (DBS) issues this Master Agreement for Adjustable Frequency Drives. Section 2 This specification describes the electrical, mechanical, environmental, agency and reliability requirements for three phases, adjustable frequency drives as specified herein. The materials will be provided at the contractor's actual cost plus a fixed-fee adder bid by the contractor. The fixed fee adder (FFA) brackets are contained in the solicitation bid response sheet. REFERENCES The adjustable frequency drives and all components shall be designed, manufactured and tested in accordance with the latest applicable standards. 1. Institute of Electrical and Electronic Engineers (IEEE) IEEE 519-1992: Guide for harmonic content and control. 2. Underwriters Laboratories (UL508C: Power Conversion Equipment) UL and CUL 3. National Electrical Manufacturer's Association (NEMA) ICS 7.0 Industrial Controls and Systems for AFD's 4. EN 61000-3-12, EN 61800-3 (1996) +A11 (2000) Category C2 Ful fill all EMC immunity requirements In case of conflict between the requirements of this section and those of the listed documents, the requirements of this section shall prevail. The following information shall be submitted with the bid document. 1. Dimensioned outline drawing 2. Control Schematic diagram 3. Power and control connection diagrams(s) Submit two (2) copies of the above information. The supplier of this equipment shall have produced similar electrical equipment for a minimum period of ten (10) years. A list of installations with similar equipment installed within the last three (3) years shall be provided with the bid response for demonstration of compliance with this requirement. SUMBITTAL FOR INFORMATION (Post Award) When requested by the AUR the following product information shall be provided 1. Product bulletins 2. Technical product data sheets 3. Harmonic analysis results SUBMITTAL FOR CLOSE-OUT (Post Award) The following information shall be submitted for record purposes prior to final payment. 1. Specification Sheet 2. Operating manuals 3. Maintenance manuals QUALIFICATIONS The supplier of the assembly shall be the manufacturer of the electromechanical power components used within the assembly, such as bypass contactors, power distribution circuit breakers, when specified. The parts when specified shall have a commonality with other manufacturer's products. DELIVERY, STORAGE AND HANDLING Equipment shall be handled and stored in accordance with manufacturer's instructions. One (1) copy of these instructions shall be included with the equipment at time of shipment. Delivery Location Department for Facilities and Support Services Division of Mechanical Services 701 Holmes Street Frankfort, KY 40601 Delivery Time All orders placed against the contract awarded from this solicitation shall be delivered to the delivery location within thirty (30) days after receipt of order.

Post-Bid

Municipal

$250,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
54
Bidding Soon
1,062
All Active Projects
409
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2023

February 17, 2023

img_map_placeholder

701 Holmes St, Frankfort, KY

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.