BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Frankfort, Kentucky. Design plans call for the renovation of a water / sewer project.

As of October 3, 2023, a design team has been identified. Short List Meeting: November 7, 2022. 10:00 AM, ET Virtual Meeting Interviews (subject to change): November 16, 2022. 9:00 AM, 10:00 AM, 11:00 AM Virtual Meeting If three or fewer firms submit responses to this RFP, all firms will be interviewed. The Interviews may be moved to the date set for the shortlist meeting. Technical Advisor for this project: Frieda Myers, Div of Engineering, 403 Wapping Street, 2nd Floor, Frankfort, KY 40601, Phone: (502) 782-0328, Email: Frieda.Myers@ky.gov Requests for Information: Amanda Greer: Phone: (502) 330-8159. E-mail: Amanda.Greer@ky.gov PROJECT DESCRIPTION The Commonwealth of Kentucky, Finance & Administration Cabinet, Division of Engineering & Contract Administration (DECA) is seeking professional design services for the Department of Corrections (DOC) to develop specifications and bid documents as well as contract administration to provide painting and repairs for various water towers at DOC facilities. Inspections were previously provided by Preferred Tank and Tower, Inc. indicating four (4) Elevated Water Towers (EWT), owned by the Commonwealth of Kentucky Department of Corrections, are out of compliance with requirements set forth by OSHA, EPA, NFPA and AWWA. While there is no fine or regulatory penalty for using these water towers being out of compliance, maintaining potable water in the towers is priority. Exterior corrosion on tank surface can cause leaks and risk tower tank shut down. Repairs are needed to maintain the water towers/tanks and to meet requirements as set forth by authorities having jurisdiction to meet health safety and security of the facilities. The towers maintain water pressure and capacity during utility supply outages. Repairs consist of painting interior and exterior of the structures, structural integrity of the entire tank system, updates needed for worker safety to comply with OSHA standards, removal of sediment and debris in the tank, and quality potable water supply to the facilities. The water towers supply water to the following Correctional Facilities: Bell County Forestry Camp (BCFC), Eastern Kentucky Correctional Complex (EKCC), Kentucky Correctional Institution for Women (KCIW), Kentucky State Penitentiary (KSP) and in LaGrange, KY: Kentucky State Reformatory (KSR), Roederer Correctional Complex (RCC) and Luther Luckett Correctional Complex (LLCC). CONSULTANT TEAM COMPOSITION The consultant team shall include, at a minimum, the following professional design Disciplines/Expertise. Disciplines/Expertise may reside in one or multiple persons/firms. The consultant team may include other expertise in additional to that listed below. o Architect o Structural Engineer o Civil Engineer INDICATION OF KENTUCKY REGISTRATION This project requires the services of an Architect and/or Engineer registered in Kentucky. Respondents are to provide, in their response submittal, Kentucky Architectural Registration or Kentucky Board of Registration for Professional Engineers numbers for each Architect and/or Engineer that will be providing services for this project. RESPONDENTS ARE TO PROVIDE REFERENCES Respondents are to provide a minimum of three (3) references from similar projects. These references are to include: name of project, address of project, date project completed, Construction amount, current contact person and phone number. PROJECT SCHEDULE To be confirmed during design Phase A 60 days Phase B 30 days Phase C 90 days Phase D TBD during design process Proposers are encouraged to take a screen shot verifying proposal submittal or email the buyer for verification at Amanda.Greer@ky.gov. Only one proposal is to be submitted

Design

Water / Sewer

$1,820,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
34
Bidding Soon
1,031
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.