Site work for a power facility in Sherbrooke, Prince Edward Island. Working plans call for site work for a power facility.

Expansion of the 138-kV transmission system from Sherbrook to Skinners Pond. The proposed transmission system will support the addition of approx. 100MW of proposed wind farms in western PEI by 2030, strengthen the grid west of Sherbrook with improved redundancies, and upgrade the allowable loads on the grid. TIMELINE: Project is in detailed design. Owner anticipates initiating the construction procurement process as early as late 2026. Construction is tentatively scheduled for 2027. Further update may be available mid-2026.

Final Planning

Power Plant

$44,000,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
52
Bidding Soon
415
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2027

Project location map

Multiple Locations, Sherbrooke, PE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.