BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Burnside, Kentucky. Completed plans call for the renovation of a playground / park / athletic field.

Estimated Length of Project: 45 (Substantial Completion) + 30 (Final Completion) 1. Remove existing asphalt shingles and underlayment to decking. 2. Remove existing wood siding where indicated on Drawings. 3. Remove existing plywood roof sheathing that has been damaged and deteriorated. 4. Install new 1/2" thick plywood roof sheathing to replace roof deck that was removed. 5. Install new ice and water shield over 100% of area to be reroofed. 6. Install new 40-year, asphalt shingles. 7. Install new weather barrier where existing siding was removed. 8. Install new fiber cement board siding at mansards. 9. Install new prefinished, galvanized steel trim where indicated on Drawings. Questions must be submitted to the contacts listed above no later than 12:00 P.M. (noon) Eastern Time, October 21, 2022. All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky.

Award

Playgrounds / Parks / Athletic Fields

$47,200.00

Public - State/Provincial

Renovation

6

14

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
35
Bidding Soon
458
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

November 15, 2022

img_map_placeholder

8801 US-27, Burnside, KY

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.