Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 7, 2022 at 7:00 PM
Updated October 1, 2024
Renovation of a mixed-use development in Sturgis, Michigan. Completed plans call for the renovation of a educational facility.
As of December 7 2022, project was awarded to Division 7 Building Contractors, Inc., awarded amount is $186,731.47. Sturgis High School (SHS) Entry Area and Kitchen Roof Replacement - The Scope of Work includes the Entry Area Roof as well as the Kitchen Roof: 1. Tear off and disposal of existing membrane, insulation, cover board, and built up roof substrate as necessary. 2. Insulation should be a mechanically two layers of 2.5 inch Polyisocynurate Flat insulation with screws and plates. Implement appropriate tapered insulation to achieve slope around roof drains and perimeters. 3. Membrane should implement a Carlisle Syntec, Verico or Firestone Adhered EPDM 60 Mil Membrane Roofing System. Placement and installation of walkways pads to protest roof membrane as specified by manufacturer. 4. Penetrations & Flashings should include all necessary membrane flashings at perimeters andpenetrations for rooftop units and piper protrusions. 5. Drains should include membrane flashings. 6. The implementation of steel fascia edge metal system in any manufacturer standard color. 7. The warranty should be a 20 year warranty system that covers all materials and labor. 8. Installation of expansion joints for integration of new roof with existing structure. Bids shall be prepared in accordance with specifications outlined in Request for Bid. Questions of a technical nature which may arise as a result of this Request for Bid may be directed to Ray Sterling, Director of Finance, (269) 659-1503. Bids shall be on forms furnished by Sturgis Public Schools. Please include your latest catalog/service brochures with your bid. A bidder will be permitted to withdraw his bid, unopened, after it has been submitted if so requested prior to the time specified above for opening of bids. The successful bidder shall be required to enter into a contract with Sturgis Public Schools. Sturgis Public Schools is exempt from all taxes. The right to reject any or all bids, either in whole or in part, or to waive any informalities or irregularities therein, is reserved by Sturgis Public Schools. Bid Result : Liquitec - Apex Industrial Roofing, LLC - $ 139,596 Duro-Last - Superior Services - $ 148,170 EPDM - Division 7 - $ 186,731.00 TPO - Division 7 - $ 182,382.00 PVC - Division 7 - $ 193,127.00
Award
Educational
$186,731.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 28, 2022
March 20, 2023
216 Vinewood Ave, Sturgis, MI
Related To This Project
Sturgis, MI
Bid Date: Dec 19 2022
Sturgis, MI
Bid Date: Jan 09 2023
Sturgis, MI
Bid Date: Jan 06 2023
Sturgis, MI
--
Sturgis, MI
Bid Date: May 23 2022
Sturgis, MI
Bid Date: Jan 24 2022
Sturgis, MI
Bid Date: Jun 03 2022
Sturgis, MI
Bid Date: Jun 13 2022
Sturgis, MI
Bid Date: Oct 24 2022
Port Sanilac, MI
Bid Date: Sep 02 2022
Clinton Township, MI
Bid Date: Sep 02 2022
Germfask, MI
Bid Date: Sep 02 2022
Cadillac, MI
Bid Date: Nov 22 2022
Milan, MI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.