Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 3, 2023 at 7:00 PM
Updated January 26, 2024
Renovation of a water / sewer project in Valley View, Ohio. Completed plans call for the renovation of a water / sewer project.
The Work to be performed under this Contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles; furnishing all labor, transportation, and services, including fuel, power, water, and essential communications; and performing all work or other operations required for the fulfillment of the Contract in accordance with the Contract Documents. The Work shall be complete and all work, materials, and services not expressly indicated or called for in the Contract Documents which may be necessary for the complete and proper construction of the Work in good faith shall be provided by the Contractor as though originally so indicated, at no increased cost to the Owner. For Repair of the Refractory Lining on Fluid Bed Incinerator No. 3 at the Renewable Energy Facility 1. The purpose of this bid and contract is to provide the Northeast Ohio Regional Sewer District (District) with a repair of the refractory lining on Fluid Bed Incinerator No. 3 at the Renewable Energy Facility located at the Southerly Wastewater Treatment Center. The work generally consists of the demolition and replacement of portions of the refractory lining in Fluid Bed Incinerator No. 3, including firebrick, insulating castable, and hard castable. We are asking that you provide your contact information in the chat function so that we can compile an attendees list. Please include, your name, company affiliation, email and phone number. If you are having difficulty accessing the software, please contact Sara Lader at (216) 973-3503. Nicholas Merchant-Wells can be reached at Merchant-WellsN@neorsd.org ; or, (216) 308-6849 Personal Protective Equipment (PPE) is required for site visits include hard hat, eye protection, safety vest and steel-toe shoes. If you have any questions submit them via email to Jeffrey Harraman at harramanj@neorsd.org Purchasing Manager pd The design of this project was completed by the owner's in-house design professional.
Award
Water / Sewer
$297,194.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 8, 2022
December 8, 2022
6000 Canal Rd, Valley View, OH
Related To This Project
Valley View, OH
Bid Date: Dec 20 2022
Valley View, OH
--
Valley View, OH
Bid Date: Aug 15 2022
Valley View, OH
Bid Date: Aug 25 2022
Valley View, OH
Bid Date: Mar 03 2023
Valley View, OH
Bid Date: Mar 02 2023
Valley View, OH
Bid Date: Mar 20 2023
Valley View, OH
Bid Date: Apr 04 2023
Huron, OH
Bid Date: Sep 26 2022
McDermott, OH
Bid Date: Sep 26 2022
Union Township, OH
Bid Date: Sep 29 2022
Massillon, OH
Bid Date: Sep 27 2022
Bryan, OH
Bid Date: Oct 12 2022
Cleveland, OH
Bid Date: Aug 24 2022
Cleveland Hts, OH
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
