Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Peoria, Arizona. Contact the soliciting agency for additional information.
Project Name: Town of Eagar Main Street Lighting / Bullhead Parkway Lighting and Median Installation Project (TRACS) Number: T0356 03D / T0393 03D District: Northaast / Northwest Route/MP: Main Street, Central Ave to Town of Springerville Town Limit Bullhead Parkway - 1.5 miles north of Silver Creek Road to Arroyo Vista Drive Funding Source: HSIP Construction Funding FY: FY 2024 The proposed project is to install 60 new lights along the Main Street and at intersections to provide better visibility. Lights would be installed on Main Street beginning at Central Ave (SR 260) to the Town of Springerville town limits (roughly one mile). Install 60 new lights along the Main Street and at intersections to provide better visibility. Lights would be installed on Main Street beginning at Central Ave (SR 260) to the Town of Springerville town limits (roughly one mile). Environmental: Minimal ground disturbance anticipated (Light Pole foundations). ROW: All work will be performed within the existing Town Right of Way. Utility and Rail Road: Possibility of relocating some utilities near sidewalks. Town will relocate water and sewer if necessary and will communicate with Navopache Electric for power movement. Design of concrete raised median and street lighting on Bullhead Parkway from 1.5 miles north of Silver Creek Road approximately 3.25 miles to Arroyo Vista Drive. These improvements will directly address the predominant fatal and incapacitating injury crashes that have been experienced in this corridor, namely road departure and nighttime. Ground disturbing activities will be required; no utility relocations are anticipated. Questions, in writing, shall be received by ECS at the below email address until October 13, 2022 at 2:00 P.M. (Arizona Time). No further questions shall be accepted after the time specified. The design consultant shall lead the project development process. Stage submittals shall consist of Stage II, Stage III, Stage IV and Final PS&E. Environmental considerations are CE only. No new right of way is anticipated to be required. No URR impacts are anticipated. The consultant shall provide a bid package which includes plans, specifications and estimates for construction. The consultant shall also provide necessary project management tasks including coordination, meetings, project schedule updates and comment responses. Document retention, project schedule, and risk register updates within the Workfront platform will be required. Final Questions Due: October 13, 2022 at 2:00 P.M. (Arizona Time) SOI Submittal Date: October 18, 2022 at 11:00 A.M. (Arizona Time) Estimated Selection Date: October 31, 2022 The method of contractor selection has not been determined at this time. AZ DOT - RFQ - Project Development On-Call - Town of Eagar Main Street Lighting / Bullhead Parkway Lighting and Median Installation
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2023
W Rose Garden Ln & N 107th Ave, Peoria, AZ
Related To This Project
Peoria, AZ
--
Peoria, AZ
Bid Date: Mar 10 2022
Peoria, AZ
Bid Date: Jan 11 2022
Peoria, AZ
Bid Date: Mar 20 2020
Peoria, AZ
--
Peoria, AZ
Bid Date: Nov 02 2022
Peoria, AZ
Bid Date: Oct 25 2022
Peoria, AZ
Bid Date: Aug 22 2022
Peoria, AZ
Bid Date: Oct 25 2022
Peoria, AZ
Bid Date: Nov 01 2022
Peoria, AZ
Bid Date: Nov 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.