BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Peoria, Arizona. Contact the soliciting agency for additional information.

Project Name: Town of Eagar Main Street Lighting / Bullhead Parkway Lighting and Median Installation Project (TRACS) Number: T0356 03D / T0393 03D District: Northaast / Northwest Route/MP: Main Street, Central Ave to Town of Springerville Town Limit Bullhead Parkway - 1.5 miles north of Silver Creek Road to Arroyo Vista Drive Funding Source: HSIP Construction Funding FY: FY 2024 The proposed project is to install 60 new lights along the Main Street and at intersections to provide better visibility. Lights would be installed on Main Street beginning at Central Ave (SR 260) to the Town of Springerville town limits (roughly one mile). Install 60 new lights along the Main Street and at intersections to provide better visibility. Lights would be installed on Main Street beginning at Central Ave (SR 260) to the Town of Springerville town limits (roughly one mile). Environmental: Minimal ground disturbance anticipated (Light Pole foundations). ROW: All work will be performed within the existing Town Right of Way. Utility and Rail Road: Possibility of relocating some utilities near sidewalks. Town will relocate water and sewer if necessary and will communicate with Navopache Electric for power movement. Design of concrete raised median and street lighting on Bullhead Parkway from 1.5 miles north of Silver Creek Road approximately 3.25 miles to Arroyo Vista Drive. These improvements will directly address the predominant fatal and incapacitating injury crashes that have been experienced in this corridor, namely road departure and nighttime. Ground disturbing activities will be required; no utility relocations are anticipated. Questions, in writing, shall be received by ECS at the below email address until October 13, 2022 at 2:00 P.M. (Arizona Time). No further questions shall be accepted after the time specified. The design consultant shall lead the project development process. Stage submittals shall consist of Stage II, Stage III, Stage IV and Final PS&E. Environmental considerations are CE only. No new right of way is anticipated to be required. No URR impacts are anticipated. The consultant shall provide a bid package which includes plans, specifications and estimates for construction. The consultant shall also provide necessary project management tasks including coordination, meetings, project schedule updates and comment responses. Document retention, project schedule, and risk register updates within the Workfront platform will be required. Final Questions Due: October 13, 2022 at 2:00 P.M. (Arizona Time) SOI Submittal Date: October 18, 2022 at 11:00 A.M. (Arizona Time) Estimated Selection Date: October 31, 2022 The method of contractor selection has not been determined at this time. AZ DOT - RFQ - Project Development On-Call - Town of Eagar Main Street Lighting / Bullhead Parkway Lighting and Median Installation

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
22
Bidding Soon
726
All Active Projects
305
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2023

img_map_placeholder

W Rose Garden Ln & N 107th Ave, Peoria, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.