BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fillmore, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of November 22, 2022 , this project has not yet been awarded. The project is expected to be awarded on December 13,2022.** The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required in the Plans, Specifications and Contract documents for said project to cold mill, pavement overlay, P.C.C. repairs, asphalt pavement repairs, and ADA improvement at Two Rivers Park. The work will take place on various streets and Two Rivers Park, Fillmore, California, and other related work as described in the Specifications and Contract Documents, by reference, made a part hereof. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. All work to be done under this contract shall be completed within THIRTY (30) consecutive working days, beginning on the date stipulated in the written Notice to Proceed to be issued by the Engineer. In entering into a public works contract, or a subcontract, to supply goods, services, or materials pursuant to a public works contract, the Contractor and all subcontractors agree to follow the State Labor standards. State Labor standards provisions, including prevailing wage requirements, will be enforced such that the general rate of per diem wages (prevailing wage) shall be paid for each craft, classification, or type of worker needed to execute the contract to all workers employed in the execution of the contract. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement) as further described in Article IX of the Agreement. Each contractor and subcontractor listed on the bid must be registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5, subject to the limited exceptions set forth in Labor Code Section 1771.1(a) (regarding the submission of a bid as authorized by Business & Professions Code Section 7029.1 or Public Contract Code Section 10164 or 20103.5, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded). Bids must be accompanied by cash, or by cashiers or certified check made payable to the City of Fillmore, or by a bid bond executed by an admitted surety insurer on the bond form provided herein, in the amount of ten percent (10%) of the amount of bid price, made payable to the City of Fillmore as a guarantee that the bidder, whose bid is accepted, will promptly execute the contract, secure payment of workers compensation insurance, and furnish a satisfactory faithful performance bond in the amount of one hundred percent (100%) of the total bid price and a payment bond (labor and material bond) in the amount of one hundred percent (100%) of the total bid price which complies with all of the requirements of Civil Code Section 9554. The City will deduct a five percent (5%) retention from all progress payments as specified in Section 9-3.2 of the Standard Specifications for Public Works Construction. The City in accordance with Public Contract Code Sect. 22300 shall permit the substitution of securities for any moneys withheld by a public agency to ensure performance under a contract. The City hereby incorporates herein all of the provisions set forth in Public Contract Code Sect. 22300. At the time of Award of the Contract, the Prime Contractor must have a valid California State Contractor's License with a classification of in accordance with provisions of Chapter 9, Division 111, Sections 7000 through 7145 of the Business and Professions Code of the State of California and the Prime Contractor shall warrant that it and all subcontractors are properly licensed, which includes each entity having a local business license. The City reserves the right to reject any and all bids or to waive any irregularities or informalities in any bids or in the bidding, should it deem this necessary for the public good, and also the bid of the bidder who has been delinquent or unfaithful in any former contract with the City of Fillmore. No bidder may withdraw his or her bid for a period of sixty (60) days after the date from the opening thereof. Question Deadline 10/20/2022 at 10:00 AM PT All bid questions shall be submitted through electronically. One response to all questions will be posted in PlanetBid on Tuesday, October 25, 2022.

Bid Results

Roads / Highways

$1,344,035.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
376
Active Projects
179
Bidding Soon
3,033
All Active Projects
1,354
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 27, 2022

December 26, 2022

February 6, 2023

img_map_placeholder

1110 River St, Fillmore, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.