Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 1, 2023 at 7:00 PM
Updated January 26, 2024
Renovation of a recreation facility in Largo, Florida. Completed plans call for the renovation of a recreation facility.
Highland Recreation Complex Generator Installation. The City of Largo is soliciting proposals from qualified licensed firms for the installation of a new standalone 500KW 625 KVA, 480Y/277volt 3 phase generator with automatic transfer switch and a 72-hour capacity diesel fuel tank to power the entire Highland Recreation Complex so it can be utilized as an emergency shelter. Deadline for questions is October 27, 2022. If you have any questions regarding this Request for Proposal, please contact Omar Jimenez, Office of Performance and Budget, (727) 587-6740, or via email at ojimenez@largo.com. Based upon the actual Duke Energy recorded load for the building, compensation for motor starting current from the as-built drawings, plus some spare capacity, the load calculations result in the following: Recommended Selection: 500 KW/625 KVA, 480Y/277 volt, 3 phase. The generator will be located outside, near the existing electrical room, inside a 180MPH wind speed rated, missile impact rated, critically silenced enclosure, with an in-base fuel tank. The tank will be sized for 72 hours of fuel capacity running at 100% of rated load. Stairs are recommended for easier access up to the generator due to the tank height. A new 1600 amp, 3 pole, 480-volt, automatic transfer switch (ATS) is required. The ATS will be located outside and will replace the existing generator docking station. The existing Main Switchboard EDP will be field modified to remove the tie bus between the main breaker and tie breaker. Field modification is required to be performed by a Schneider Electric (Square D) factory service group. The load side of the main breaker output will be re-routed with a new 1600-amp feeder to the new ATS. The new generator will feed the emergency side of the ATS. The load side of the ATS will feed into the line side of the tie breaker, using the existing 1600-amp feeder from the demolished docking station.
Award
Amusement and Recreation
$400,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2022
January 30, 2023
Multiple Locations, Largo, FL
Related To This Project
Largo, FL
Bid Date: Oct 25 2022
Largo, FL
Bid Date: Oct 04 2022
Largo, FL
Bid Date: Dec 18 2023
Largo, FL
Bid Date: Oct 13 2022
Largo, FL
Bid Date: Aug 16 2022
Largo, FL
Bid Date: Oct 13 2022
Largo, FL
Bid Date: Dec 04 2019
Largo, FL
--
Inverness, FL
Bid Date: Oct 20 2022
Port St Lucie, FL
Bid Date: Jun 09 2023
Lecanto, FL
Bid Date: Nov 01 2022
Orlando, FL
Bid Date: Nov 22 2022
Coral Gables, FL
Bid Date: Oct 28 2022
Hialeah, FL
Bid Date: Oct 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
