BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 13, 2022 at 7:00 PM

Updated January 25, 2024

Demolition, site work, paving, renovation and addition to a mixed-use development in Saint Charles, Missouri. Completed plans call for the addition of a 5,400-square-foot, one-story above grade fire / police facility; sidewalk / parking lot; for the demolition of a fire / police facility; sidewalk / parking lot; for the renovation of a fire / police facility; 100,000-square-foot sidewalk / parking lot; for site work for a fire / police facility; sidewalk / parking lot; for paving for a fire / police facility; and sidewalk / parking lot.

**As of November 21, 2022, this project has not yet been awarded. The project is expected to be awarded on December 19, 2022** The City of St. Charles Missouri will receive sealed bids clearly marked "ST. CHARLES POLICE DEPARTMENT PHASE -2 ADDITION, RENOVATIONS & PARKING LOT RESURFACING". There will be one (1) bid package associated with this bid. It shall be for a General Contractor. Please reference the detailed scope of work narrative provided in the bid documents. The work will include providing the necessary labor, materials and equipment to replace approximately 6 heat pumps, cooling tower, 5 RTUs and a boiler in the existing Police Department structure as well as phased renovations. Scope also includes a 5,400 SQFT one story addition and approximately 100,000 SQFT of asphalt split between remove & replacement with new HD asphalt and overlay of existing. The City reserves the right to reject any or all proposals, or to advertise for new proposals if deemed necessary. A. Construction procedures to promote adequate indoor air quality after construction. B. Building flush-out after construction and before occupancy. C. Testing indoor air quality before commencement of construction; existing building areas only. D. Testing indoor air quality after completion of construction. E. Testing air change effectiveness after completion of construction *As of November 9, 2022, addendum 1 has been issued.

Award

Fire / Police

$6,264,180.00

Public - City

Addition, Demolition, Paving, Renovation, Site Work

103

30

46

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
94
Bidding Soon
1,345
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2022

December 8, 2022

Project location map

1781 Zumbehl Rd, Saint Charles, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.