Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 30, 2023 at 7:00 PM
Updated January 26, 2024
Site work and paving for a road / highway in Castle Rock, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Job Location Town of Castle Rock Question Acceptance Deadline 11/03/2022 06:30 PM EDT Questions are submitted online No SCOPE: This Project was established to complete construction of a roundabout at the Crystal Valley Parkway / Plum Creek Boulevard intersection. General Description - The work to be performed under this contract includes removal/replacement of existing asphalt pavement, aggregate base course, hot mix asphalt paving at various depths and types within the streets, storm and water pipe, manholes/inlets and appurtenances, sidewalk, pavement markings, signs, curb and gutter, and landscaping. The work under this contract also includes traffic control, erosion control installation and maintenance, potholing and coordination with all utilities. The Contractor shall supply all labor, materials and equipment necessary to complete the work in accordance with these plans and specifications. The contractor shall complete all work within two hundred seventy (301) calendar days from the Notice to Proceed date. The Notice to Proceed date is estimated to be December 19, 2022. If contract calendar days are exceeded "liquidated damages" will be assessed. General Requirements - Bidder Prequalification/Preregistration Required - Bid Deposit Required - Insurance Required
Award
Roads / Highways
$3,337,813.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 10, 2022
December 9, 2022
Crystal Valley Pkwy & Plum Creek Blvd, Castle Rock, CO
Related To This Project
Castle Rock, CO
Bid Date: Sep 14 2022
Castle Rock, CO
Bid Date: Sep 14 2022
Castle Rock, CO
Bid Date: Sep 09 2022
Castle Rock, CO
Bid Date: Sep 12 2023
Castle Rock, CO
Bid Date: Nov 02 2022
Castle Rock, CO
Bid Date: Nov 03 2022
Castle Rock, CO
Bid Date: Nov 12 2021
Castle Rock, CO
Bid Date: Aug 19 2022
Castle Rock, CO
Bid Date: Oct 14 2022
Castle Rock, CO
--
Castle Rock, CO
Bid Date: May 20 2022
Castle Rock, CO
Bid Date: May 20 2022
Castle Rock, CO
--
Castle Rock, CO
Bid Date: Aug 19 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
