EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 7, 2022 at 7:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Aledo, Illinois. Working plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

As of December 7, 2022, bids were canceled. No definite date for the rebid. City/county - Mercer Description: Removal of Existing 3 Span Steel Continuous Bridge, Construction of a 3 Span Galvanized Steel Continuous Bridge on Existing Piers, Modifications of Spill-thru Abutments and 535 Feet of Roadway Work. 276 Cu Yds of Channel Excavation, 0.3 Acre of Seeding, 27 Pounds Nitrogen Fertilizer, 27 Pounds of Phosphorous Fertilizer, 27 Pounds Potassium Fertilizer, 1485 Sq Yd Erosion Control Blanket, 50 Ft of Temp. Ditch Checks, 219 Foot of Perimeter Erosion Blanket, 4 Each Inlet Pipe Protection, 1054 Ton of Aggregate Surface Course B, 328 Sq Yd of Protective Coat, 164 Tons Aggregate Shoulders B, 1 Each Rem Exist Super Structure, 5.7 Cu Yd Concrete Removal, 106 Foot Pope Culvert Removal, 24 Cu Yd Structure Excavation, 5.0 Cu Yd Concrete Structure, 93.1 Cu Yd Concrete Super Structure, 303 Sq Yd Bridge Deck Grooving, 1 Lsum F&e Structural Steel, 1540 Each Stud Shear Connections, 24,130 Pounds Reinforcement Bars Epoxy Coated, 227 Foot Steel Railing Type Sm, 1 Each Name Plate, 15 Each Elastic Bearing Assembly Type 1, 30 Each Anchor Bolts 3/4, 10 Each Anchor Bolts 1, 54 Foot Pipe Culverts Class D1 18 Inch, 34 Foot Pipe Culverts Class D1 24in, 39 Foot Pipe Culvert Class D1 48in, 46 Cu Yd Granular Backfill Str, 32 Sq Yd Geo Composite Wall Dr, 1 Lsum Mobilization, 1 Lsum Construction Lay Out, 100 Foot Pipe Underdrain, for Structure 4in, 351 Cu Yd Earth Excavation, 1057 Ton Stone Rip Rap Cl A5 Special, 1 Lsum Traffic Control and Protection Special Project Location: County Highway 6 (270th St) Over Henderson Creek ILDOT - Removal of Existing 3 Span Steel Continuous Bridge

Final Planning

Bridges / Tunnels

$824,353.00

Public - County

Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
31
Bidding Soon
569
All Active Projects
243
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2022

June 7, 2023

img_map_placeholder

270TH ST, Aledo, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Removal of Existing 3 Span Steel Continuous Bridge

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.