BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2022 at 7:00 PM

Updated January 25, 2024

Site work and paving for a bridge / tunnel in Framingham, Massachusetts. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

612878-120571 All work under this Contract shall be done in conformance with the 2022 Standard Specifications for Highways and Bridges, the Supplemental Specifications contained in this book, the 2017 Construction Standard Details, the Traffic Management Plans and Detail Drawings, MassDOT Work Zone Safety Temporary Traffic Control, the 1990 Standard Drawings for Signs and Supports; the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 2009 Manual on Uniform Traffic Control Devices (MUTCD) with Massachusetts Amendments; the 1968 Standard Drawings for Traffic Signals and Highway Lighting; The American Standard for Nursery Stock; the Plans and these Special Provisions. The work to be done under this contract will include deck repairs, installation of the new overlay (wearing surface), milling and paving approaches, substructure repairs and cleaning (full removal) and painting of all existing structural steel in the superstructure, as well as all the bearings. The work will include the application of an elastomeric protective coating to concrete surfaces at the piers after areas of deterioration (delamination and spalling). The work will include miscellaneous structural steel repairs and in-kind diaphram/utility support replacement, removal of concrete haunches and installation of expandable metal shielding over the roadway. The Contractors attention is directed towards the Repair Procedure Notes and Details contained in Document A00803. All proposed work hours shall conform to Subsection 7.09 and be subject to the written approval of the Engineer. Work schedules deviating from the normal work schedule will be subject to approval by the Engineer. Work will be restricted to non-peak hours or night work as directed by the Engineer to avoid peak traffic volumes and to maintain safety and productivity. Location: Framingham Project Type: Painting - Structural MASSDOT - Bridge Repairs and Related Work (Including Painting) Bridge Number F-07-050 (Steel) Route 9 Over Interstate 9

Award

Bridges / Tunnels

$4,246,680.00

Public - State/Provincial

Paving, Site Work

146

9

5

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
631
Active Projects
294
Bidding Soon
4,710
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2022

January 23, 2023

Project location map

I-90, Framingham, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.