BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a playground / park / athletic field in Chicago Heights, Illinois. Completed plans call for site work for a playground / park / athletic field.

The Architect has been authorized to refuse to issue plans and specifications and related bidding documents to any person, firm or corporation that the Architect considers to be unqualified. No bid shall be withdrawn after the opening of the proposals without the consent of School District 172 for a period of sixty (60) days after the scheduled time of closing bids. APPLICABLE REQUIREMENTS All employees of the Contractor or Subcontractor(s) on construction work for this Project shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Department of Labor in accordance with the applicable provisions of the "Wages of Employees on Public Works Act" (Prevailing Wage Act, Illinois Rev. Stat., 820 ILCS 130/1 et. seq.) and with all applicable provisions of the "Illinois' Preference Act", 30 ILCS 570/.01 et. seq. The successful Bidder of the construction of the improvement will be required to file a performance and payment bond equal to one hundred percent (100%) of the contract, with sureties to be approved by the Architect, which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract: and also that the successful Bidder, now the Contractor, shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and material furnished for himself and all of his subcontractors. The bonding company shall have a minimum rating of "A VIII " in accordance with Best's Key Rating Guide - Latest Edition. The Contractor shall be required to furnish sufficient insurance or guaranty of indemnity to School District 172 against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the School District 172. The Owner reserves the right to reject any and all proposals or bids

Bid Results

Playgrounds / Parks / Athletic Fields

$96,830.00

Public - City

Site Work

6

9

5

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
465
Active Projects
269
Bidding Soon
3,370
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2022

March 20, 2023

Project location map

2950 Glenwood Dyer Rd, Chicago Heights, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.